What is not included in the technical specification? - ANSWER General Conditions
Bid documents include? - ANSWER •contract
•specifications
•contract drawings
Codes, standards, Authority Having Jurisdiction (AHJ), clean-up, safety requirements,
barricades, fencing, insurance and bond requirements, ect. - ANSWER General
Conditions
Addendums, time schedules, working days allowed, delay agreements, payment schedules -
ANSWER Supplementary Conditions
Specifications typically use what format? - ANSWER Construction Specifications
Institute (CSI)
Construction manager concept is when the owner contracts with the construction manager
who oversees ____________ working on the project - ANSWER Contractors
Sometimes referred to as a turn-key type agreement or contract? - ANSWER Design-
Build Concept
1
,Multiple Prime Contractor Method has the intent is eliminate the middleman __________
__________. - ANSWER general contractor
Multiple prime contractor method involve more than one prime contractor which consist of?
- ANSWER •architectural/structural contractor
•mechanical contractor
•electrical contractor
Who commonly uses the multiple prime contractor method? - ANSWER •federal
government
•general services administration (GSA)
•large companies
Traditional method contract uses the typical chain of command which is? -
ANSWER Owner, architect, general contractor, subcontractor
General contractors can be chosen in a number of different ways which is? -
ANSWER •open bid method
•bid-by invitation procedure
•direct contractor selection
Contract conditions is divided into two categories which is? - ANSWER General
category and supplementary conditions
Changes to the contract or other modifications. - ANSWER Addendum
Types of payment schedules are? - ANSWER •up-front payments
•progress payments
2
, •lump sum
What comprises the project manual? - ANSWER Bidding requirements, sample forms,
conditions of the contract and specifications, including general conditions and
supplementary conditions
Contract documents include: - ANSWER •contract itself
•contract conditions
•specifications
•drawings
Drawings have different stages which are? - ANSWER Preliminary, bid, approval,
construction, as-built
Oftentimes a project will begin with a _________. - ANSWER Request for proposal
(RFP)
Value-engineering team typically consist of? - ANSWER •certified value specialist
•owner's representatives
•designers and consultants
•the construction team
•cost estimator
•building management staff
•third-party (independent) reviewers
Value-engineering typically goes through phases which are? - ANSWER •Information
gathering
•brainstorming
•analysis
3
UPDATE!!!!2025/2026|GUARANTEED
What is not included in the technical specification? - ANSWER General Conditions
Bid documents include? - ANSWER •contract
•specifications
•contract drawings
Codes, standards, Authority Having Jurisdiction (AHJ), clean-up, safety requirements,
barricades, fencing, insurance and bond requirements, ect. - ANSWER General
Conditions
Addendums, time schedules, working days allowed, delay agreements, payment schedules -
ANSWER Supplementary Conditions
Specifications typically use what format? - ANSWER Construction Specifications
Institute (CSI)
Construction manager concept is when the owner contracts with the construction manager
who oversees ____________ working on the project - ANSWER Contractors
Sometimes referred to as a turn-key type agreement or contract? - ANSWER Design-
Build Concept
1
,Multiple Prime Contractor Method has the intent is eliminate the middleman __________
__________. - ANSWER general contractor
Multiple prime contractor method involve more than one prime contractor which consist of?
- ANSWER •architectural/structural contractor
•mechanical contractor
•electrical contractor
Who commonly uses the multiple prime contractor method? - ANSWER •federal
government
•general services administration (GSA)
•large companies
Traditional method contract uses the typical chain of command which is? -
ANSWER Owner, architect, general contractor, subcontractor
General contractors can be chosen in a number of different ways which is? -
ANSWER •open bid method
•bid-by invitation procedure
•direct contractor selection
Contract conditions is divided into two categories which is? - ANSWER General
category and supplementary conditions
Changes to the contract or other modifications. - ANSWER Addendum
Types of payment schedules are? - ANSWER •up-front payments
•progress payments
2
, •lump sum
What comprises the project manual? - ANSWER Bidding requirements, sample forms,
conditions of the contract and specifications, including general conditions and
supplementary conditions
Contract documents include: - ANSWER •contract itself
•contract conditions
•specifications
•drawings
Drawings have different stages which are? - ANSWER Preliminary, bid, approval,
construction, as-built
Oftentimes a project will begin with a _________. - ANSWER Request for proposal
(RFP)
Value-engineering team typically consist of? - ANSWER •certified value specialist
•owner's representatives
•designers and consultants
•the construction team
•cost estimator
•building management staff
•third-party (independent) reviewers
Value-engineering typically goes through phases which are? - ANSWER •Information
gathering
•brainstorming
•analysis
3