100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CON 367 MIDTERM EXAM QUESTIONS AND ANSWERS 2025

Rating
-
Sold
-
Pages
15
Grade
A+
Uploaded on
14-11-2025
Written in
2025/2026

CON 367 MIDTERM EXAM QUESTIONS AND ANSWERS 2025

Institution
CON 367
Course
CON 367









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CON 367
Course
CON 367

Document information

Uploaded on
November 14, 2025
Number of pages
15
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CON 367 MIDTERM LATEST
EXAM
Which one of the following is not an element of the Contract as we
discussed in class? - ANSWERS-Promise


Which of the following is not a condition where a contract will not be
enforced by courts? - ANSWERS-Seniority


Fill in the blank in the following statement: Some contracts must be in
writing under the ____________ as adopted by each state: -
ANSWERS-Statute of Frauds


RFI (Request for Information) is the document that is transmitted to the
General Contractor from the Designer to get clarifications with respect
to design drawings and specifications. - ANSWERS-False


The resident project representative should not supervise, direct, or
control the contractor's means and methods of performing work. -
ANSWERS-True


In Multiple Prime delivery system, the services of a professional
construction management firm (Agency CM) can be essential. -
ANSWERS-True

END OF
PAGE
1

, CON 367 MIDTERM LATEST
EXAM

A professional construction management firm (Agency CM) can
participate in the following phases of a project: - ANSWERS-
Conception, Program Planning, Design, Construction, and Closeout


The design-build process may face some legal barriers when tried to be
implemented in the public sector. - ANSWERS-True


On a multiple-prime project, the owner is responsible for coordinating
the various trade contractors with whom it has contracted. - ANSWERS-
True


The Resident Project Representative does not need to make any
measurement for the progress
payments in the lump-sum projects. - ANSWERS-False


Use of Building Information Modeling (BIM) in construction projects
may result in a reduction in
Requests for Information (RFIs) and change orders. - ANSWERS-True



END OF
PAGE
2

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Teacher101 Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
369
Member since
1 year
Number of followers
71
Documents
8696
Last sold
1 day ago

Quality is my middle name.....100% ...my policy is to create and nurture people of quality by continuous education and training.....i guaranteed good grades 100% Feel free to get in touch through inbox...anything regarding help or issue with the exams posted... Finally after purchase please leave a good rating if satisfied with my work.... All the best as we continue working to improve ourselves through education

4.6

263 reviews

5
217
4
14
3
23
2
3
1
6

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions