100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

SWM DEQ NEWEST 2026/2027 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!!

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
12-11-2025
Written in
2025/2026

SWM DEQ NEWEST 2026/2027 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!!

Institution
SWM DEQ
Course
SWM DEQ









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
SWM DEQ
Course
SWM DEQ

Document information

Uploaded on
November 12, 2025
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • swm deq

Content preview

SWM DEQ

A locality VSMP authority must encompass enforcement authority and a schedule of civil
penalties for enforcement moves in its neighborhood ordinance. The maximum penalty the
authority might also issue is - ANS-$32,500 in step with violation in step with day
A locality VSMP need to be at the least as stringent as what country permit? -
ANS-Construction GP
A simple rooftop disconnect isn't really helpful for residential lots less than - ANS-6,000 toes^2
A violation of the development gp is a contravention of the - ANS-stormwater management act
Every three to five years, or whenever 6 to 12 inches of sediment have amassed, the sediment
forebay must have the sediment eliminated. A scheduled inspection this is deemed dangerous
by negative weather may be behind schedule by one enterprise day, but this need to be noted in
the SWPPP. ANS should be paid into the locality's treasury for any civil penalty imposed by a
courtroom in reaction to a summons issued via a VSMP authority. Any character who violates.....
Will be problem to a civil penalty not to exceed - ANS-$32, 500
Are aid sports covered underneath the Construction GP? - ANS-Yes, if it meets unique criteria
At a minimum, a stormwater control facility shall be inspected by way of the accountable
country corporation on an - ANS-annual basis and after any storm that reasons the ability of the
facility's essential spillway to be exceeded
Can vegetated emergency spillways be built into fill? - ANS-No, has to be armored if built into
fill
Construction GP, pollutants prevention plan, and additional control measures to cope with
TMDL aren't required in CBPA LDAs. CBPA LDAs must have - ANS-accepted E&SC plan,
accepted SWM plan, nearby approval to begin land disturbance, long-time period upkeep
agreement, production file drawings
Changes in the SWPPP have to be made in a __ day length - ANS-7
Chesapeake Bay Preservation Areas that result in a land disturbance more than or identical to
____ and much less than ____ - ANS-2,500 feet^2, 1 acre
Compliance necessities for channel protection rely upon - ANS-sort of channel being
discharged to and sort of float
Concrete Wash Water need to be directed right into a - ANS-leak-proof field or leak-evidence
settling basin
Corrective moves made based totally on inspections ought to be accomplished - ANS-as
quickly as practicable however no later than seven days, or a longer time period as authorized
by means of the VSMP
Date for the stop of the economic yr - ANS-October 1
On request, DEQ has ___ days to finish a review of real or capacity influences throughout
jurisdictions - ANS-90. DEQ is needed to behavior a application review as soon as every -
ANS-5 years
DEQ is accountable for imposing the ____ while locality ____ are accountable for imposing
local ordinances - ANS-Construction GP, VSMP

, Difference between sizable and in depth for vegetated roof - ANS-big: low plant life with three"
to 6" boom medium, in depth medium 6 to 12"
ANS-stage 1 is a one-cell design, while level 2 is a -mobile layout. This is the distinction among
stage 1 and stage 2 filtering practices. Difference among degree 1 and level 2 permeable
pavement - ANS-for stage 1, UD is required
The ANS-raise sizes for the overall earthen embankment are 8 inches, while those for the
component around the pipe are 4 inches. Difference in swale slopes for moist swale level 1 and
level 2 - ANS-level 1 swale slopes less than 2%, degree 2 swale slopes much less than 1%
Dimensions of a soil compost amended clear out - ANS-20 ft lengthy and 10 feet huge
- ANS-submit-production: Does the SWM plan cope with runoff for the duration of or after
creation? Erosion and sediment manage measures need to be used whilst the soil compost
amended vicinity is what size? - ANS-2,500 feet^2 or greater
The bottom of the inlet pipe in a wet pond ought to be same to the everlasting pool's water
stage, or ANS. For a moist pond, the max slope of the protection bench is - ANS-five%
Inspections may be executed - ANS-as soon as a month for all web sites in which regions have
been temporarily stabilized or LDA were suspended because of frozen situations. For an
earthen embankment, bushes must be planted how far past the embankment? - ANS-25'
What is the most test dam top for dry swale check dams? - ANS-12" When backfilling an
earthen embankment, device need to no longer be pushed any closer than four ft horizontally to
any part of the shape. For reviews of unauthorized discharges, should notify DEQ upon
discovery inside a ___ window and a written report should be submitted inside ___ of discovery
of discharge - ANS-24 hours, five days
For soil compost change prep you have to deep till 2-3' with rips - ANS-perpendicular to path of
glide
Side and longitudinal slopes of grass channels need to be ANS-3H:1V or flatter, with a
maximum longitudinal slope of four%. How long does it commonly take to fully establish a
vegetated roof? - ANS-12 to 18 months
How long must a VSMP authority preserve inspection reviews? - ANS-3 years
How many design scales are there fore infiltration practices? - ANS-three
If a Construction GP covers guide activities do you have to look at it? - ANS-Yes
If a recorded long-term renovation agreement is not required then the power is - ANS-not issue
to the VSMP authority post creation inspection necessities
If an E&SC exercise is going to be converted to a everlasting BMP, how have to the elevations
evaluate? - ANS-BMP elevation must be decrease
If DEQ issues a Stop Work Order in a non-emergency setting, what is required? - ANS-a
listening to
If regulatory approval is wanted for corrective moves - ANS-additional manage measures must
be implemented in the mean time
If help sports meet the requirements to be covered below the Construction GP, they must be
indexed on the - ANS-registration statement
If the emergency spillway can't be reduce into current floor or cut, it ought to be - ANS-armored
(cannot simply be vegetated)

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ashley96 Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
586
Member since
2 year
Number of followers
198
Documents
5001
Last sold
22 hours ago

In my page you will find all latest Exams , with Questions and Answers, package deals, etc. I upload quality. Instant delivery. You will get solutions to all subjects in both assignments and major exams. Contact me for any assistance. Good Luck!!!

4.0

148 reviews

5
82
4
21
3
25
2
6
1
14

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions