100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

SWM Combined Administrator Exam - VA DEQ NEWEST 2026/2027 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!!

Rating
-
Sold
-
Pages
8
Grade
A+
Uploaded on
12-11-2025
Written in
2025/2026

SWM Combined Administrator Exam - VA DEQ NEWEST 2026/2027 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!!

Institution
SWM DEQ
Course
SWM DEQ









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
SWM DEQ
Course
SWM DEQ

Document information

Uploaded on
November 12, 2025
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

SWM Combined Administrator Exam -
VA DEQ

"Conserved" open areas should be ______________ in to be considered as open space in the
VRRM. - ANS-Undisturbed

A permeable pavement gadget with out an undrain have to have an infiltration fee of: -
ANS-zero.Five" in step with hour or extra

A sediment trap collects from regions that are_____. - ANS-< three acres

A stormwater management facility will be inspected by way of the accountable kingdom
business enterprise on a ____ basis and after any typhoon that causes the capacity of the
facility's precept spillway to be handed. - ANS-Annually

A VSMP authority can trouble _____ as enforcement. - ANS-Verbal warnings, Notice of
Correction, Consent Orders, Notice to Comply

All ESC plans encompass a _______ for the ESC measures used. - ANS-a announcement
describing the protection responsibilities required

Application Packages require: - ANS--SWPPP
-Long time period Maintenance Agreement
-Bond
-Fees
-Registration Statement

Are wetlands required to have sediment forebays? - ANS-Yes, sediment forebays are required
to be at each inlet to a constructed wetland.

As a Stormwater Inspector, are you accountable for inspecting any assist sports worried with a
assignment? - ANS-Yes, under the CGP you must look into the web sites in which assisting
activities are taking place.

Can grass channels be used in karst regions? - ANS-Yes, so long as they don't deal with
hotspot runoff.

Can soil amendments be incorporated into karst regions? - ANS-Yes so long as they do not deal
with hotspot runoff.

, Certificates of competency are legitimate for ____. - ANS-3 years

Construction report drawings ought to be stored for the way lengthy? - ANS-Until the stormwater
facility is removed

Define the Virginia Runoff Reduction Method. - ANS-A compliance approach used in VA to cope
with pollutant loads through incorporating ESD, runoff treatment, and extent manipulate
alternatives.

End date for 2C standards - ANS-June 30, 2019 (Grandfathered projects), June 30, 2024 (Time
Limits on Applicability)

Exceptions to the technical requirements of element 2B or component 2C may not be granted
for: - ANS--Economic hardship alone
-Obtaining required nation lets in
-Use of a BMP not in the Stormwater BMP Clearinghouse

Exemptions to the SWM software: - ANS-Mining operations, land clearing for Agricultural
functions, unmarried-own family houses annoying < 1 acre, discharges to a sanitary or
combination sewer, activities executed underneath a reclamation venture, routine protection to
preserve unique situations, LDAs in reaction to a public emergency

Final Stabilization - ANS-When a uniform, evenly dispensed perennial vegetative cover with a
density of 70% of the local history cowl has been hooked up on all unpaved areas and areas
now not blanketed by means of everlasting systems.

For a level 1 moist swale, what is the whole phosphorus removal percent? - ANS-20%

For drainage regions <= 200 acres, the VSMP may allow for the use of: - ANS-The Rational
Method

Grass channels should be seeded at a density such that __________% of grass survives after
the 2nd growing season. - ANS-90%

How can oil / fuel spills be prevented from discharging off of a site? - ANS-1. Use a secondary
containment method (spill berms, decks, etc.)
2. Cover the area with an impermeable sheet.
3. Have spill kits near by.

How far does water travel as sheet flow before it starts to become concentrated flow? -
ANS-100 feet

How much total volume (Tv) should a level 1 extended detention pond have? - ANS-A minimum
of 15% of the total volume in the permanent pool.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ashley96 Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
586
Member since
2 year
Number of followers
198
Documents
5001
Last sold
22 hours ago

In my page you will find all latest Exams , with Questions and Answers, package deals, etc. I upload quality. Instant delivery. You will get solutions to all subjects in both assignments and major exams. Contact me for any assistance. Good Luck!!!

4.0

148 reviews

5
82
4
21
3
25
2
6
1
14

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions