CONSTRUCTION QUALITY MANAGEMENT FOR CONTRACTORS (CQM-C) | 2025/2026 EXAM ACTUAL EXAM QUESTIONS AND CORRECT ANSWERS WITH RATIONALES GRADED A+ LATEST

Rating
-
Sold
-
Pages
49
Grade
A+
Uploaded on
12-11-2025
Written in
2025/2026

CONSTRUCTION QUALITY MANAGEMENT FOR CONTRACTORS (CQM-C) | 2025/2026 EXAM ACTUAL EXAM QUESTIONS AND CORRECT ANSWERS WITH RATIONALES GRADED A+ LATEST CQM-C Exam, covering foundational knowledge, advanced QA/QC scenarios, safety integration, subcontractor management, and final project closeout with detailed rationales for every question.

Show more Read less
Institution
CQM-C
Course
CQM-C











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CQM-C
Course
CQM-C

Document information

Uploaded on
November 12, 2025
Number of pages
49
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CONSTRUCTION QUALITY MANAGEMENT FOR
CONTRACTORS (CQM-C) | 2025/2026 EXAM
ACTUAL EXAM QUESTIONS AND CORRECT
ANSWERS WITH RATIONALES GRADED A+
LATEST

CQM-C Actual Exam
1.
Which of the following best defines quality control (QC) in construction?
A. Ensuring project cost stays within budget
B. The process of monitoring construction activities to ensure compliance with
specifications
C. Managing project schedule and workforce
D. Negotiating contracts with subcontractors
✅ Answer: B. The process of monitoring construction activities to ensure
compliance with specifications
Rationale:
Quality control focuses on verifying that construction work meets project
specifications and contractual requirements. Cost and schedule are important but
are not the primary focus of QC.


2.
A contractor identifies a defect in concrete work after pouring. The most
appropriate immediate action is:
A. Continue construction and document the defect
B. Stop work, isolate the affected area, and notify the responsible parties
C. Attempt minor fixes without approval
D. Ignore the defect if it seems minor

,✅ Answer: B. Stop work, isolate the affected area, and notify the responsible
parties
Rationale:
Early identification and isolation prevent defects from affecting the entire project.
Documentation and proper notification maintain accountability.


3.
Which document typically describes the quality requirements for a construction
project?
A. Project schedule
B. Contract specifications
C. Purchase orders
D. Safety manual
✅ Answer: B. Contract specifications
Rationale:
Contract specifications provide detailed quality expectations, materials,
workmanship standards, and testing requirements.


4.
A contractor wants to implement a systematic approach to prevent defects rather
than just detect them. This is called:
A. Quality Assurance (QA)
B. Quality Control (QC)
C. Risk Management
D. Project Scheduling

✅ Answer: A. Quality Assurance (QA)
Rationale:
QA is proactive, focusing on preventing errors by establishing processes and
standards, whereas QC is reactive, detecting defects after they occur.

,5.
Which of the following is a key responsibility of a CQM-C certified
professional?
A. Estimating project costs
B. Overseeing quality management processes and ensuring compliance with
specifications
C. Drafting legal contracts
D. Managing subcontractor payroll

✅ Answer: B. Overseeing quality management processes and ensuring
compliance with specifications
Rationale:
CQM-C professionals focus on quality management, inspection, documentation,
and verification to meet project requirements.


6.
A project requires documentation of all inspections, tests, and corrective actions.
The primary purpose is:
A. To create a marketing portfolio
B. To provide evidence of compliance for audits and regulatory review
C. To satisfy the architect’s curiosity
D. To reduce labor costs
✅ Answer: B. To provide evidence of compliance for audits and regulatory
review
Rationale:
Documentation serves as a permanent record that the work meets specifications
and can be reviewed during audits or disputes.

, 7.
A contractor notices that a subcontractor is not following approved welding
procedures. The correct CQM-C action is:
A. Allow the work to continue and inspect later
B. Immediately stop work, document the issue, and ensure corrective action is
implemented
C. Ignore and report at project completion
D. Ask the subcontractor to fix it at their convenience
✅ Answer: B. Immediately stop work, document the issue, and ensure
corrective action is implemented
Rationale:
Non-compliance with approved procedures can compromise safety and quality;
immediate corrective action prevents escalation.


8.
Which type of inspection is performed before work begins to verify materials,
equipment, and preparations?
A. Final inspection
B. Pre-construction or pre-installation inspection
C. Corrective inspection
D. Post-construction audit

✅ Answer: B. Pre-construction or pre-installation inspection
Rationale:
Pre-construction inspections ensure that all prerequisites are met and work starts
according to specifications, preventing later issues.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
johnkibathi28 Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
43
Member since
2 year
Number of followers
15
Documents
681
Last sold
6 days ago
Best Studyguide Resources

Welcome to Best Studyguide Resources – your trusted source for accurate, reliable, and up-to-date study materials. As a certified tutor, I understand how important the right resources are for exam preparation and academic success. That’s why every guide, test bank, and study package in this shop is carefully curated, professionally organized, and designed to help you succeed. I am committed to delivering only top-tier documents to ensure the best outcomes for your academic success. Gain instant access to expertly curated materials designed to help you excel in your studies and certifications. Take the next step toward achieving your academic and professional goals Feedback is always welcome. I encourage all clients to leave a review after purchase—whether positive or constructive—to help me improve and continue offering the best possible support.

Read more Read less
3.5

8 reviews

5
5
4
0
3
0
2
0
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions