100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

RECF- CIVIL ENGINEERING RRECF- CIVIL ENGINEERING REVIWED QUESTIONS WITH ANSWERSEVIWED QUESTIONS WITH ANSWERS

Rating
-
Sold
-
Pages
4
Grade
A+
Uploaded on
10-11-2025
Written in
2025/2026

RECF- CIVIL ENGINEERING REVIWED QUESTIONS WITH ANSWERS

Institution
SECB - Structural Engineering Certification Board
Course
SECB - Structural Engineering Certification Board








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
SECB - Structural Engineering Certification Board
Course
SECB - Structural Engineering Certification Board

Document information

Uploaded on
November 10, 2025
Number of pages
4
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

RECF- CIVIL ENGINEERING REVIWED QUESTIONS WITH
ANSWERS.2
1. Water treatment plants use a process of sedimentation to remove dirt and other solid
particles from the water. In plain terms, this is __________ . - correct answer letting
particles settle to the bottom of the tank


2. What is NOT the primary designed use of a dam? - correct answer To capture and store
seasonal rains for year-round water consumption


3. Which shape is found most often in trusses? - correct answer Triangles


4. If a given canal lock is 30 ft wide and 60 ft long and the pipes that transfer water have a flow
rate of 1500 cfm, how long will it take for the water level to change by 5 ft? - correct
answer 6 minutes


5. Which of the following is not good for a seaport? - correct answer A body of shallow water


6. In determining a bridge's efficiency, you use the formula: Efficiency = mass held/mass of
bridge. Given this table, what is the efficiency of Bridge 2? - correct answer 0.909


7. The best reason to build a scale model is __________ . - correct answer to create a visual
and spatial representation for analysis before building


8. It is 7 PM and the temperature is 60 degrees. It takes 1 hour to pour the cement. What time
will the cement be set using the chart, assuming the temperature does not change? -
correct answer 3AM


9. If a cargo boat comes into port displacing 1800 ft3, but leaves displacing 3600 ft3, what did
they do in port given the density of water is 62.42 lbs/ft3? - correct answer They added
112,356 lbs in cargo weight.
$8.59
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
simonnjaramba

Get to know the seller

Seller avatar
simonnjaramba Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
New on Stuvia
Member since
4 weeks
Number of followers
0
Documents
82
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions