ANSWERS
The Virginia Stormwater Management Program is authorized by
|\ |\ |\ |\ |\ |\ |\ |\
the ______ and administered through the ______ - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔Virginia Stormwater Management Act, Virginia
|\ |\ |\ |\ |\ |\
Stormwater Management Program Regulation |\ |\ |\
VPDES Permit/Construction GP authorizes discharge of
|\ |\ |\ |\ |\ |\
stormwater from construction activities that are - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔greater than or equal to an acre
|\ |\ |\ |\ |\ |\ |\
The Stormwater Management Act requires the State Water
|\ |\ |\ |\ |\ |\ |\ |\
Control Board to - CORRECT ANSWERS ✔✔permit, regulate, and
|\ |\ |\ |\ |\ |\ |\ |\ |\
control stormwater runoff
|\ |\
DEQ has ___ days to complete review of real or potential inter-
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
jurisdictional impacts upon request - CORRECT ANSWERS ✔✔90
|\ |\ |\ |\ |\ |\ |\
The Stormwater Management Act requires the following
|\ |\ |\ |\ |\ |\ |\
individuals to obtain and maintain a certificate of competency -
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔staff of a stormwater program, anyone
|\ |\ |\ |\ |\ |\ |\ |\
contracted by a VSMP authority, standard and specification
|\ |\ |\ |\ |\ |\ |\ |\
holders
The dual certificate will expire three years from - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔the latest date of the certificates
|\ |\ |\ |\ |\ |\
,SWM plan must be approved by ___ before land disturbance -
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔VSMP program authority |\ |\ |\ |\
The water quality criteria sets a site-based load limit of ____ of
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
total phosphorus for new development - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\
✔✔0.41 lbs/acre/year |\
The phosphorus load limit uses the - CORRECT ANSWERS ✔✔10%
|\ |\ |\ |\ |\ |\ |\ |\ |\
impervious cover
|\ |\
Part II B and II C water quantity criteria addresses - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔channel protection and flood protection
|\ |\ |\ |\ |\
Which two plans in the SWPPP must be approved? - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔SWM plan, ESC plan |\ |\ |\ |\
Does the SWM plan address runoff during or after construction? -
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔post-construction |\ |\
What is the lower limit of the range of imperviousness that can
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
result in stream degradation? - CORRECT ANSWERS ✔✔10%
|\ |\ |\ |\ |\ |\ |\
What do land disturbing activities consist of? - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔excavating, clearing, grading |\ |\ |\
, LDA threshold for the SWM Act and Regulation - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔1 acre or 2500 square feet for Chesapeake Bay
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
Preservation Act |\
In situations where an initial exemption was applicable because
|\ |\ |\ |\ |\ |\ |\ |\ |\
LDAs were related to emergency work, VSMP authority shall be
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
advised of the disturbance within - CORRECT ANSWERS ✔✔7
|\ |\ |\ |\ |\ |\ |\ |\ |\
days of commencing the LDA and shall submit a permit
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
application within 30 days of starting the land-disturbing activity
|\ |\ |\ |\ |\ |\ |\ |\
Localities with MS4 - CORRECT ANSWERS ✔✔must adopt and
|\ |\ |\ |\ |\ |\ |\ |\ |\
administer a stormwater program |\ |\ |\
Localities without MS4 - CORRECT ANSWERS ✔✔may choose to
|\ |\ |\ |\ |\ |\ |\ |\ |\
administer a VSMP or have DEQ administer the program |\ |\ |\ |\ |\ |\ |\ |\
DEQ is responsible for enforcing the ____ while locality ____ are
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
responsible for enforcing local ordinances - CORRECT ANSWERS |\ |\ |\ |\ |\ |\ |\ |\
✔✔Construction GP, VSMP |\ |\
A locality VSMP authority must include enforcement authority and
|\ |\ |\ |\ |\ |\ |\ |\
a schedule of civil penalties for enforcement actions in its local
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
ordinance. The maximum penalty the authority may issue is -
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
CORRECT ANSWERS ✔✔$32,500 per violation per day |\ |\ |\ |\ |\ |\
Any civil penalty assessed by a court as a result of a summons
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
issued by a locality VSMP authority must be paid - CORRECT
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
ANSWERS ✔✔into the locality's treasury |\ |\ |\ |\