-2026 latest update \complete questions and
correct detailed answers \verified 100% Graded A+
A pilot working in a 705 75 hours in 90 days
operation must
completed how many
hours upon the
completion of a PPC?
In order to be eligble to 1) Acted as a flight crew member on the flight deck or
act as PIC of an aircraft in as an observer within the last 12 months along that
a 705 operation on a particular route or into that particular aerodrome, or
particular route or into a
particular aerodome, they 2) Have received the required training and demonstrated
adequate knowledge
must have completed
what? (2 Options)
1) 0-50 = 1 Kit
2) 51-150 = 2 kits
How do you calculate the first
aid kit requirements? 3) 151-250 = 3 kits
4)251+ = 4 kits
If issued a speed change, +/- 10 KIAS
then you are required to
maintain that speed to:
What is the maximum flight 100 hours in 30 days
duty time for a pilot on call?
In order to fly IFR, the pitot- 24 months
static system must have been
calibrated with in the last:
Whos duty is it to report The air operator ASAP
"unforeseen
operation circumstances" to the
Minister?
,When Operating an aircraft 2
above FL250 in a
pressurized aircraft in an air
transport
service; the aircraft must
carry sufficient oxygen to
supply the crew for a
minimum of how many
hours?
1) At all times while operating at cabin altitudes above 13,000'
When does the Pilot at the
2) if not equipped with quick donning masks and operated above
controls have to wear an FL250
oxygen mask?
3)Regardless of mask type, when operating above FL410
What is the maximum holding 175 KIAS
speed of a propeller driven
aircraft?
A passenger oxygen briefing FL250
must be
completed prior to passing
what altitude in a
pressurized aircraft?
How long must an air At least 3 years
operator hold on to pilot
training records?
Both Conditions are based on having no MEL
What is the rule for operating
with an inoperative FDR? 1) Maximum 90 days after the failure of the CVR and the FDR must
and for an inoperative CVR? be operative
Maximum of 90 days after the failure of the FDR and the CVR
2)
must be operative
In terms of controlled rest 30 minutes before descent for landing into an aerodrome
on the flight deck, when
should all flight crew
members be awake?
What is an MEL based off of? The Master MEL and the Procedures Manual for the aircraft
,Flight crew members of a 7 consecutive days
705 operation are requires
on rest period of at least
36 hours within each
period of:
in a 705 Operation, 1) 6 Months
recurrent flight training is
required every , and 2) 12 Months
emergency
procedure training along
with line checks are
required every _.
Part of an aerodrome, other than maneuvering area, intended for
What is an Apron?
loading and
unloading of passengers and cargo, refueling, servicing,
maintenance, parking, etc
Part of an aerodrome, other than an apron, used for
What is a maneuvering area?
takeoff and landing of an aircraft and movement of an
aircraft for this purpose (taxiway/runway).
Part of an aerodrome for surface movement of aircraft
What is a movement area?
including maneuvering area and aprons.
1) 15%
to dispatch a 704 turbo-jet
aircraft into a wet runway in other words, the runway must be
condition, the Landing
115% of Dry LDA. Only true if there
Distance Available must be
is no published Wet LDA in an AFM
__________________ longer
than
the dry Landing Distance
Available.
A) 50' on the Radar Altimeter
What is the lowest Decision
Height for a Category 3A
B) 50' or less on the Radar Altimeter
approach?
A
c) No Decision Height, Auto Land
Category
3B? A
Category
3C?
, Special Use Airspace
Advisory or Restricted
What is Class F Airspace? Airspace Can be
Controlled
Can be Uncontrolled
Combination of the
Two
A Turbojet aircraft in a 705 15% of the dry Landing
that does not contain Distance Available. In other
information for landing on a words, 115% of Dry LDA.
wet runway in it's AFM and
is planning to land into a
wet runway. In order to be
dispatched, the air operator
must increase the
calculated runway
requirements for an
additional:
A Turbojet aircraft in a 705 60%
operation may not be
dispatched unless the As a note, it can be dispatched if the destination
landing distance required at doesn't meet this requirement but the alternate at the
the destination or time of arrival does.
alternate is at most of the
available
landing distance.
A turboprop aircraft (turbo-jet 70%
pr large
aircraft) operated in a
Commuter Operation may
not be dispatched unless
the Landing Distance
Required at the Alternate
and Destination is at most
______________ of the
Landing
Distance Available