100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

NPDES EROSION AND SEDIMENT CONTROL: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM, EXAM 2025/2026 WITH CORRECT/ACCURATE ANSWERS

Rating
-
Sold
-
Pages
31
Grade
A+
Uploaded on
04-11-2025
Written in
2025/2026

NPDES EROSION AND SEDIMENT CONTROL: NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM, EXAM 2025/2026 WITH CORRECT/ACCURATE ANSWERS

Institution
NPDES EROSION AND SEDIMENT CONTROL
Course
NPDES EROSION AND SEDIMENT CONTROL











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NPDES EROSION AND SEDIMENT CONTROL
Course
NPDES EROSION AND SEDIMENT CONTROL

Document information

Uploaded on
November 4, 2025
Number of pages
31
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NPDES EROSION AND SEDIMENT
CONTROL: NATIONAL POLLUTANT
DISCHARGE ELIMINATION SYSTEM, EXAM
2025/2026 WITH CORRECT/ACCURATE
ANSWERS


Best Management Practices (BMPs)
A combination of erosion control (preventing soil from moving) and sediment control (trapping soil
that does move) BMPs is necessary.
Control Description & Examples
Type

Erosion Protect the soil surface and prevent particles from
Controls becoming dislodged. Examples: Seeding, mulching,
sodding, erosion control blankets, riparian buffers,
preserving existing vegetation, and phased construction.

Sedime Trap sediment after it has eroded and before it leaves the
nt site. Examples: Silt fences, inlet protection, sediment
Controls traps, sediment basins, and check dams.




Minimum Standard 1 - CORRECT-ANSWERS--Stabilization


permanent or temporary soil stabilization shall be applied to denuded
areas within seven days after final grade is reached on any portion of the
site; temporary soil stabilization shall be applied within seven days to
denuded areas that may not be at final grade but will remain dormant for

,longer than 14 days; permanent stabilization shall be applied to areas that
are to be left dormant for more than one year


Site NOT at Final Grade - CORRECT-ANSWERS--- stabilize in 14 days
- temporarily seed
- mulch
- permanently stabilize if dormant > 1 year


Site at Final Grade - CORRECT-ANSWERS--- stabilize in 7 days
(recommended immediately)
- permanently or temporarily seed and mulch
- mulch/matting/straw


Minimum Standard 2 - CORRECT-ANSWERS--Stock Piles, Waste and Borrow
Areas


during construction, soil stock piles and borrow areas shall be stabilized or
protected with sediment trapping measures


mulch prevents erosion by protecting the surface from raindrop impact
and silt fence intercepts and detains from disturbed areas


Minimum Standard 3 - CORRECT-ANSWERS--Permanent Vegetation


permanent vegetation cover shall be established on denuded areas not
otherwise permanently stabilized (permanent vegetation shall not be

,considered established until a ground cover is achieved that is uniform,
mature enough to survive, and will inhibit erosion *there is no %
associated with this*)


reduce erosion and decrease sediment yield from disturbed area


this is the standard used to verify that a site is ready for release of bonds
or surety


Minimum Standard 4 - CORRECT-ANSWERS--First-Step Measures


Sediment basins and traps, perimeter dikes, sediment barriers and other
measures intended to trap sediment shall be constructed as a first step in
any land-disturbing activity and shall be made functional before upslope
land disturbance takes place


a certain amount of initial land disturbance may be required to provide
access for equipment to install the perimeter controls, but site clearing
and grading should be kept to a minimum until the perimeter controls are
in place


intercepts and detains small amounts of sediment from disturbed areas
during construction operation to prevent sediment from leaving the site
and decrease velocity of sheet flows and low-to-moderate level channel
flow

, Perimeter Controls - CORRECT-ANSWERS--assures that sediment does not
leave the perimeter of the land-disturbing area once site clearing,
grading, and construction commences


Examples: silt fences, sediment traps, sediment basins, construction
entrance, temporary diversions, diversions


Minimum Standard 5 - CORRECT-ANSWERS--Earthen Structure
Stabilization


stabilization measures shall be applied to earthen structures such as
dams, dikes, and diversions immediately after installation


reduce erosion and sedimentation and reduce damage from sediment and
runoff to downstream or off-site areas


Minimum Standard 6 - CORRECT-ANSWERS--Traps and Basins


sediment traps and basins shall be designed and constructed based upon
the total drainage area (not just disturbed area) to be served by the trap
or basin


Sediment Traps - CORRECT-ANSWERS--minimum storage capacity shall be
134 cubic yards per acre of drainage area and shall only control drainage
areas less than 3 acres


*stone outlet = trap*

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Elitaa Chamberlain university
View profile
Follow You need to be logged in order to follow users or courses
Sold
169
Member since
1 year
Number of followers
25
Documents
7088
Last sold
1 day ago
100% VALID NURSING 507 ADVANCED PATHOPHYSIOLOGY EXAMS 2025/2026 GRADED A+ RATED, AND HIGHLY RECOMMENDED FROM CHAMBERLAIN UNIVERSITY & OTHERS eg BSN246 HESI, BIOS 256, TFM08, WGU D027 AND WGU D236 PATHO etc.... AND DON'T BE A CHALLENGE TO BE CHALLENG

We have just re-established our shop, my aim is to elevate and guide students academically with actual guides and exams 100% verified.Incase you dont find the exam that you are looking for,feel free to inbox me and request any exam.My prices are never fixed,always negotiable , WELCOME ,LETS BEGIN.

3.6

25 reviews

5
10
4
5
3
5
2
1
1
4

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions