NCIDQ - IDPX Baseline Exam Latest Questions
And Correct Detailed Answers (Verified
Answers)
Question: Which of the following puts more responsibility on the
designer, can be used to explore unique design solutions and the use
of new technology, are used to set criteria rather than requirements,
and must be coordinated with the AHJ for final approval?
Prescriptive Specifications
Performance Codes
Prescriptive Codes
Proprietary Specifications
Ans: Performance Codes
Question: What is the drawing for the 54th floor electrical plan?
54E3.1
E3.1-54
3.1E-54
Master01 | 2025/2026 | Latest update
, 2
none of the above
Ans: 54E3.1
Question: After defining the exact scope of work and selecting
individual floor finish types for each area of your project, you must
provide your client with an updated working budget number.
Which method of estimating would be used at this time?
Local Cost Indicies
Square Footage Method
Parameter Method
Matrix Costing
Ans: Parameter Method
Question: You are working with a client on a quick retrofit that
requires furniture to be ordered, delivered and installed within a quick
4-week time period.
Master01 | 2025/2026 | Latest update
, 3
Which form during the ordering process with the furniture
dealer/manufacturer/vendor should you give careful attention in order
to verify the timeline will not be disrupted?
Freight Bill
Acknowledgement
Purchase Order
Sales Agreement
Ans: Acknowledgement
Question: During construction, changes in the construction work are
made by all of the following means except?
change order change
directive minor
change in work
addenda
Master01 | 2025/2026 | Latest update
, 4
Ans: addenda
Question: All of the following steps are part of the project close out
except?
respond to owner's questions and problems during period immediately
after move in process verify issuance of certificate of occupancy final
application and certificate for payment verify owner has received all
lien waivers
Ans: verify issuance of certificate of occupancy
Question: As outlined in the General Conditions of the Contract for
Construction, who pays for any field tests/inspections beyond what is
required in the contract documents?
Owner
General Contractor
Interior Designer
Both the Owner and the General Contractor
Master01 | 2025/2026 | Latest update
NCIDQ - IDPX Baseline Exam Latest Questions
And Correct Detailed Answers (Verified
Answers)
Question: Which of the following puts more responsibility on the
designer, can be used to explore unique design solutions and the use
of new technology, are used to set criteria rather than requirements,
and must be coordinated with the AHJ for final approval?
Prescriptive Specifications
Performance Codes
Prescriptive Codes
Proprietary Specifications
Ans: Performance Codes
Question: What is the drawing for the 54th floor electrical plan?
54E3.1
E3.1-54
3.1E-54
Master01 | 2025/2026 | Latest update
, 2
none of the above
Ans: 54E3.1
Question: After defining the exact scope of work and selecting
individual floor finish types for each area of your project, you must
provide your client with an updated working budget number.
Which method of estimating would be used at this time?
Local Cost Indicies
Square Footage Method
Parameter Method
Matrix Costing
Ans: Parameter Method
Question: You are working with a client on a quick retrofit that
requires furniture to be ordered, delivered and installed within a quick
4-week time period.
Master01 | 2025/2026 | Latest update
, 3
Which form during the ordering process with the furniture
dealer/manufacturer/vendor should you give careful attention in order
to verify the timeline will not be disrupted?
Freight Bill
Acknowledgement
Purchase Order
Sales Agreement
Ans: Acknowledgement
Question: During construction, changes in the construction work are
made by all of the following means except?
change order change
directive minor
change in work
addenda
Master01 | 2025/2026 | Latest update
, 4
Ans: addenda
Question: All of the following steps are part of the project close out
except?
respond to owner's questions and problems during period immediately
after move in process verify issuance of certificate of occupancy final
application and certificate for payment verify owner has received all
lien waivers
Ans: verify issuance of certificate of occupancy
Question: As outlined in the General Conditions of the Contract for
Construction, who pays for any field tests/inspections beyond what is
required in the contract documents?
Owner
General Contractor
Interior Designer
Both the Owner and the General Contractor