1. What is the primary purpose of a project manual in construction documents?
A) To provide a narrative description of the project's design intent.
B) To organize all the written specifications, bidding requirements, and contract forms.
C) To serve as a log for all RFIs and submittals during construction.
D) To contain the project's zoning analysis and approval letters.
2. Which specification format is most commonly used for commercial construction projects
in the U.S.?
A) CSI MasterFormat
B) Uniformat
C) OmniClass
D) MasterSpec
3. A submittal log is primarily the responsibility of the:
A) Contractor
B) Architect
C) Owner
D) Subcontractor
4. The document that formally requests a change in the construction contract, including
adjustments to cost and schedule, is a:
A) Request for Information (RFI)
B) Proposal Request (PR)
C) Change Order
D) Construction Change Directive
5. What does the term "substitution" refer to in the construction process?
A) Replacing a specified material, product, or method with an proposed equivalent.
B) Swapping out one subcontractor for another.
C) Changing the project's location.
D) Using a different drawing standard.
, 6. Which of the following is typically included in Division 01 - General Requirements of the
specifications?
A) Concrete mix designs
B) Payment procedures and project meetings
C) Door hardware schedules
D) Electrical panel schedules
7. The primary goal of a building commissioning process is to:
A) Reduce the architect's liability.
B) Ensure that building systems are designed, installed, and function according to the owner's
project requirements.
C) Secure a certificate of occupancy from the local authority.
D) Create the final punch list.
8. An addendum is issued:
A) During construction to clarify a drawing.
B) After project completion to document as-built conditions.
C) During the bidding phase to modify the contract documents.
D) With the initial schematic design presentation.
9. What type of bond guarantees that the winning bidder will enter into the contract?
A) Performance Bond
B) Payment Bond
C) Bid Bond
D) Surety Bond
10. The "Critical Path" in a project schedule is defined as:
A) The sequence of activities with the most resources allocated.
B) The longest sequence of tasks that determines the project's minimum duration.
C) The path with the highest number of subcontractors.
D) The sequence of activities the owner deems most important.
11. A geotechnical report is most critical for informing the design of:
A) The roof system.
B) The interior finishes.
C) The foundation and substructure.
D) The curtain wall system.
12. Which entity is typically responsible for providing a survey describing property
boundaries, easements, and topography?
A) The Architect
B) The Civil Engineer
QUESTIONS AND ANSWERS COMPLETE
2026 NEW!! RATED A+ 100% VERIFIED
CORRECT
PDD Black Spectacles Exam 3: Practice Questions & Answers
1. What is the primary purpose of a project manual in construction documents?
A) To provide a narrative description of the project's design intent.
B) To organize all the written specifications, bidding requirements, and contract forms.
C) To serve as a log for all RFIs and submittals during construction.
D) To contain the project's zoning analysis and approval letters.
2. Which specification format is most commonly used for commercial construction projects
in the U.S.?
A) CSI MasterFormat
B) Uniformat
C) OmniClass
D) MasterSpec
3. A submittal log is primarily the responsibility of the:
A) Contractor
B) Architect
C) Owner
D) Subcontractor
4. The document that formally requests a change in the construction contract, including
adjustments to cost and schedule, is a:
A) Request for Information (RFI)
B) Proposal Request (PR)
C) Change Order
D) Construction Change Directive
5. What does the term "substitution" refer to in the construction process?
A) Replacing a specified material, product, or method with an proposed equivalent.
B) Swapping out one subcontractor for another.
C) Changing the project's location.
D) Using a different drawing standard.
, 6. Which of the following is typically included in Division 01 - General Requirements of the
specifications?
A) Concrete mix designs
B) Payment procedures and project meetings
C) Door hardware schedules
D) Electrical panel schedules
7. The primary goal of a building commissioning process is to:
A) Reduce the architect's liability.
B) Ensure that building systems are designed, installed, and function according to the owner's
project requirements.
C) Secure a certificate of occupancy from the local authority.
D) Create the final punch list.
8. An addendum is issued:
A) During construction to clarify a drawing.
B) After project completion to document as-built conditions.
C) During the bidding phase to modify the contract documents.
D) With the initial schematic design presentation.
9. What type of bond guarantees that the winning bidder will enter into the contract?
A) Performance Bond
B) Payment Bond
C) Bid Bond
D) Surety Bond
10. The "Critical Path" in a project schedule is defined as:
A) The sequence of activities with the most resources allocated.
B) The longest sequence of tasks that determines the project's minimum duration.
C) The path with the highest number of subcontractors.
D) The sequence of activities the owner deems most important.
11. A geotechnical report is most critical for informing the design of:
A) The roof system.
B) The interior finishes.
C) The foundation and substructure.
D) The curtain wall system.
12. Which entity is typically responsible for providing a survey describing property
boundaries, easements, and topography?
A) The Architect
B) The Civil Engineer