NCCER - OSHA SCAFFOLD SG EXAM UPDATED
QUESTIONS AND 100% CORRECT ANSWERS
WITH A GUARANTEED A+|| 2025-2026 LATEST
AND COMPLETE UPDATE WITH VERIFIED
SOLUTIONS|| GUARANTEED PASS!!
The footing or anchorage for scaffolds must be capable of carrying the maximum
intended load without: - ANSWER: Tying or guying
Erectors of a scaffold who exposed to potential falling object hazards shall be
provided with: - ANSWER: Over head protection
Osha requires a rest landing at intervals not exceed: - ANSWER: 35 feet
The top handrail of a scaffold must be able to withstand how many pounds of
pressure? - ANSWER: 200
When Building a scaffold inside a "goggle area" - ANSWER: Everyone inside the
area must wear goggles
The ladder should be located on a mobile scaffold will not - ANSWER: tip over
When should ties be installed? - ANSWER: During the erection process
,2|Page
What body produces the primary Code or regulations guiding the scaffolding
industry? - ANSWER: OSHA (Occupational Safety and Healthy Agency)
What should be used to erect scaffolding on uneven ground? - ANSWER:
Leveling Jacks
OSAH specifically prohibits the use of? - ANSWER: Lean to scaffolds
Boards or wooden pad placed on the soil to support scaffold legs are? - ANSWER:
Mudsills
The tube of a tube and clamp scaffold is normally what size O.D.? - ANSWER:
1.9 Inches
Scaffold decks that overlap a minimum of how many inches, unless secured in
some other way? - ANSWER: 12
the bearer in a tube and clamp scaffold is always? - ANSWER: Placed above the
adjacent runner.
What must a rolling scaffold have on each caster or roller? - ANSWER: Positive
locking device
, 3|Page
Who must inspect a scaffold each work shift and after any occurrence which could
effect a scaffold's structural integrity? - ANSWER: Competent person
What is the minimum tensile strength of D-rings and snap hooks on a safety
harness? - ANSWER: 5,000 pounds
What part of the picture is identified by the letter "G"? - ANSWER: Sill or mudsill
what part of the scaffold is identified by letter "A"? - ANSWER: Guardrail
What part of the scaffold is identified by the letter "C"? - ANSWER: Runner
What part of the scaffold is identified by the letter "F"? - ANSWER: Base plate
When is it allowed to notch out scaffold planks to make them fit? - ANSWER:
"Never"
When erecting a scaffold, the screw jack fir the adjustable leg base should not
extend more than how many inches? - ANSWER: 12 Inches
Which of the following should be used to safely secure scaffold boards to the
platform? - ANSWER: #9 tie wire and toe boards