Complete LEED Green Associate GA Test Study Guide PDF – Detailed Exam Questions, Answers, Key Concepts, and Strategies for Sustainable Design, Green Building Practices, and LEED Certification Success

Rating
-
Sold
-
Pages
37
Grade
A+
Uploaded on
22-10-2025
Written in
2025/2026

Prepare for the LEED Green Associate GA exam with this comprehensive study guide. Includes detailed exam questions, correct answers, explanations, and strategies covering sustainable design, green building practices, energy efficiency, and LEED certification requirements. Ideal for professionals and students seeking to excel in the LEED Green Associate exam and advance their career in green building and sustainability.LEED Green Associate GA test study guide, LEED exam PDF, LEED Green Associate practice questions, green building certification study guide, sustainable design exam prep, LEED GA exam answers PDF, energy efficiency and sustainability test prep, LEED Green Associate review materials, green building professional resources, LEED GA certification exam prep

Show more Read less
Institution
LEED Green Associate
Course
LEED Green Associate











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
LEED Green Associate
Course
LEED Green Associate

Document information

Uploaded on
October 22, 2025
Number of pages
37
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

100 Question LEED Green Associate Practice Test

1) Which of the following is a preferred site for a LEED building?

o. A pristine site overlooking a marsh
p. A brownfield with solvent contamination
q. An organic farm
r. habitat for an endangered species


2) A project team is interested in pursuing LEED Platinum Certification for a major
renovation. Which of the following is true?

a. There is an additional fee for Gold and Platinum Level certification
b. There is no registration or certification fee for Platinum Certified buildings
c. The project team must achieve 70 points or more to achieve LEED Platinum
certification
d. LEED Platinum certification requires achieving 80 points or more


3) Which of the following credit categories would potentially add the highest first costs in
a New Building, but also with the quickest payback?

a. Sustainable Sites
b. Water Efficiency
c. Energy and Atmosphere
d. Regional Priority


4) What certification requires a Chain of Custody (COC) number?

a. GreenGuard
b. FSC
c. Green Spec
d. Green-e


5) Which of the following is not a biobased material?

a. Plant material
b. Leather
c. Animal based material


97! © 2014 Green Buildings Online Inc. All Rights Reserved

, d. Marine material

6) What standard would a wet applied liquid adhesive need to meet to be eligible for EQ
Low Emitting Materials credit?

a. Green Seal 36
b. Green Guard
c. Green-e
d. South Coast Air Quality Management District


7) The minimum program requirements for LEED certification serve what purpose?
(choose three)

a. To give clear guidance to customers
b. To protect the integrity of the LEED program
c. To reduce challenges that occur during the LEED certification process
d. To assign your project a unique project ID number


8) A reasonable LEED boundary:

a. Is determined by the project team using the LEED Project Checklist
b. Can be shared by two buildings as long as both are LEED certified
c. Must include a permanent building or space
d. Can include adjacent land for open space credit


9) Which of the following are considered soft costs? (choose two)

a. Project drawings
b. Concrete stain
c. GreenGuard Certified furniture
d. Interest payments


10) Which statement is false about minimum program requirements?

a. Must comply with project size requirements
b. Must use reasonable LEED boundaries
c. Must be in a permanent location on existing land
d. Must have a gross floor area of at least 50% of gross land area within LEED
boundary


98! © 2014 Green Buildings Online Inc. All Rights Reserved

,11) A USGBC logo may be used to indicate: (choose two)

a. That a product meets LEED requirements
b. That a business is a USGBC member
c. That a building is LEED certified
d. That a building is anticipating LEED certification


12) How is density calculated for Surrounding Density and Diverse Uses credit
calculated? (Choose 3)

a. Separate residential density in (dwelling units/ acre)
b. Separate Non-residential density in FAR (Floor Area Ratio)
c. Combined density (buildings/ acre)
d. Combined density: square footage/ acre


13) Who can upload supporting documentation onto LEED Online?

a. The LEED AP and the project Owner
b. The Project Team Administrator
c. The Project Team Member assigned to a given credit
d. The Project Team Administrator and the Project Team Member assigned to a
given credit


14) When local zoning does not define open space, how is it measured?

a. Area within the property boundary minus the development footprint
b. Total area within the property boundary
c. Total area planted with turfgrass
d. Total green roof area in a rural setting


15) Which of the following is true about exemplary performance credits (choose two)?

a. A project could show exemplary performance on each credit
b. Exemplary performance gives a project special certification consideration
c. Exemplary performance is considered meeting the next threshold in percentage
for existing LEED credits measured using percentages
d. Exemplary performance falls under the Innovation credit category


99! © 2014 Green Buildings Online Inc. All Rights Reserved

, 16) Which credit does not have the potential for exemplary performance?

a. Optimize Energy Performance
b. Heat Island Reduction
c. Access to Quality Transit
d. Light Pollution Reduction


17) Which one of the following is not an intent of the Location and Transportation
category?

a. Encourage compact development
b. Promote alternative transportation
c. Encourage development in new areas
d. Connect with existing amenities


18) Building Life-Cycle Impact Reduction - Building and Materials Reuse is calculated
by...

a. Weight
b. Cost
c. Volume
d. Surface Area


19) Which are the best ways to reduce potable water in irrigation (choose three)?

a. Reduce lawn (turfgrass)
b. Use irrigation wells
c. Plant or protect native or adapted plants
d. Install drip irrigation


20) What materials are required to be collected under MR Storage and Collection of
Recyclables?

a. Drywall
b. Clean Wood Waste
c. Plastic Bottles
d. Electronic Waste




100! © 2014 Green Buildings Online Inc. All Rights Reserved
$22.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
docstudent96

Get to know the seller

Seller avatar
docstudent96 Chamberlain College Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
0
Member since
4 months
Number of followers
0
Documents
23
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions