1ST STEP BUILDING COLLAPSE - ANS-EVACUATION
ACCOUNTABILTY RULE, YOU GO WE GO - ANS-2 IN 2 OUT
ACCURATE DIAGRAM - ANS-SCENE SIZE UP
AFF - ANS-POLAR SOLVENTS
AFFF - ANS-FILM FORMING FOAM 3-6%
AIR ASPIRATED FOAM NOZZLE - ANS-GOOD FOR FOAM
ALCOHOL LIKE JACK DANIES IS A WHAT - ANS-POLAR SOLVENT, CUZ POLAR BEARS
LIKE COKE, IT GOES WELL WITH JACK DANIELS
BLEVE - ANS-CHOOSE C, ITS ALWAYS C, REALLY.
BUILDING COLLAPSE - ANS-PROLONGED FIRE
BUILDING CONSTRUCTION TYPE four - ANS-SOLID HEAVY TIMBER
BUILDING CONSTUCTION TYPE IS THE WORST - ANS-TYPE 5.
BUILDING SURVEY - ANS-BUILDING ADDRESS
CAD - ANS-YES LONGEST ANSWER
CHIMNEY EFFECT - ANS-DIRECTLY OVER FIRE
CLAPPER VALVE DOES WHAT - ANS-BACK FLOW PREVENTERS
CONTAINER FIRE - ANS-COOL TOP OF VESSEL
CONTROL VALVE - ANS-PIV
CYLINDER SHAPE TANK - ANS-COMPRESSED NATURAL GAS
Direct Attack - ANS-Firefighting operations related to the utility of extinguishing agents
immediately onto the burning gasoline.
DISTANCE - ANS-LABEL TARGE HAZARDS
DOT MC306 - ANS-ALUMINIUM 1203 FLAMMABLE LIQUID
, DOT MC331 CRITERIA - ANS-PRESSURIZED PAINTED WHITE
DRY BARREELL HYDRANTS - ANS-TRUE
EVAC TONES WITH VEHICLE - ANS-THREE LONG AIR HORN BEEPS
EXPOSURES - ANS-PROTECT
EXTEIOR WALL WITHOUT FIRE RESISTIVE PROTECTION, WHAT IS IT RATED -
ANS-TYPE 2
EXTINGUISHER K IS WHAT - ANS-KITCHEN
FD RADIO LICESNE - ANS-FCC
FF FOAM CALCULATION - ANS-6 FOAM HOW MUCH PERCENT WATER (94)
FF SURVEY STARTS WHERE - ANS-OUTSIDE
FIRE REPORTS - ANS-PUBLIC RECORDS
FIRE REPORTS MUST BE WHAT - ANS-CLEAR CONSISE COMPLETE (ALL THREE)
FIRE RESISTIVE CONSTRUCITON - ANS-CONTENTS OF STRUCTURE
FIRE SUPRESSION - ANS-PUT THE WET STUFF ON THE RED STUFF
FOAM - ANS-SMOTHER THAT FIRE!
FOAM APPLICATION - ANS-ROLL ON, RAIN ON, BANK ON
FOAM PERECENT EFFECTIVE AT - ANS-RECOMMENDED PERCENT
FOAM TYPE POLAR SOLVENT - ANS-AFFF
GASOLINE STORAGE - ANS-GAS TO BE STORED OUTSIDE STORAGE AREA
GREEN HYDRANT - ANS-1499 GPM
HIDDEN FIRE HOW TO CHECK - ANS-TIC
HIGH POTENTIAL OF FIRE BUILDING TYPE - ANS-TYPE five
HIGH RISE FIRE - ANS-FLOOR BELOW
HOSE TESTING - ANS-MANUFACTURE ( three-5 MIN TO TEST)