Wheeled Coach obtains competitive advantage through MRP in part
because of their excellent record integrity and insistence on record
accuracy. - 🧠 ANSWER ✔✔True
MRP is generally practiced on items with dependent demand. - 🧠 ANSWER
✔✔True
Reduced inventory levels and faster response to market changes are both
benefits of MRP. - 🧠 ANSWER ✔✔True
A dependent demand item is so called because its demand is dependent
on customer preferences. - 🧠 ANSWER ✔✔False
,The quantity required of a dependent demand item is computed from the
demand for the final products in which the item is used. - 🧠 ANSWER
✔✔True
Which of the following statements regarding Wheeled Coach is FALSE?
A) Wheeled Coach has found competitive advantage through MRP.
B) Wheeled Coach builds ambulances in a repetitive process.
C) Wheeled Coach's MRP system allowed the company to meet tight
schedules, but caused inventory to rise.
D) Wheeled Coach's MRP system maintains excellent record integrity.
E) Low inventory and high quality are two positive outcomes of Wheeled
Coach's use of MRP. - 🧠 ANSWER ✔✔C
Which of the following is NOT one of the four key tasks that Wheeled
Coach insists are necessary for successful MRP implementation?
A) The material plan must meet both schedule requirements and facility
capabilities.
B) The plan must be executed as designed.
C) Inventory investment must be minimized.
,D) Excellent record integrity must be maintained.
E) The process must adhere to stringent quality control standards. - 🧠
ANSWER ✔✔E
Demand for a given item is said to be dependent if:
A) it originates from the external customer.
B) there is a deep bill of material.
C) the finished products are mostly services (rather than goods).
D) there is a clearly identifiable parent.
E) the item has several children. - 🧠 ANSWER ✔✔D
Dependent demand and independent demand items differ in that:
A) for any product, all components are dependent-demand items.
B) the need for independent-demand items is forecast.
C) the need for dependent-demand items is calculated.
D) All of the above are true.
E) None of the above is true. - 🧠 ANSWER ✔✔D
Which of the following is NOT a key benefit of MRP?
COPYRIGHT©NINJANERD 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED
3
, A) increased quality
B) better response to customer orders
C) faster response to market changes
D) improved utilization of facilities and labor
E) reduced inventory levels - 🧠 ANSWER ✔✔A
Wheeled Coach uses ________ as the catalyst for low inventory, high
quality, tight schedules, and accurate records. - 🧠 ANSWER ✔✔material
requirements planning or MRP
________ is a dependent demand technique that uses a bill of material,
inventory, expected receipts, and a master production schedule to
determine material requirements. - 🧠 ANSWER ✔✔Material requirements
planning or MRP
Describe the role of record accuracy in Wheeled Coach's successful use of
MRP. - 🧠 ANSWER ✔✔Wheeled Coach's record integrity is excellent.
Record accuracy is recognized as a fundamental ingredient of its
successful MRP implementation. Its cycle counters are charged with
material audits that not only correct errors but also investigate and correct
problems.