Boom Angle Calibration - ANS Calibrating using a protractor measuring 90 degrees from the
crane deck.
Outrigger Setup - ANS Crane tires on the ground firmly to support weight.
Hoisting Wind Speed - ANS Max 20 mph; competent person assesses safety to continue.
LMI System Disablement - ANS Only during assembly, disassembly, and load testing.
Two Audible Signals - ANS Operator intends to stop.
Dynamic Action Swinging Crane - ANS Radius decreases, load weight increases.
Leaving Cab Safety - ANS Operator restricts access, keeps crane in view.
Broken Wires Removal - ANS 2 broken wires in 6 rope diameters.
1 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED
, Stowing Load Position - ANS Where chart provides best stability configuration.
Choker Hitch Capacity - ANS Rated at 50% of vertical hitch capacity.
Signal Person Assignment - ANS Responsibility lies with the lift director.
Picking Points Location - ANS Above the center of gravity when attaching slings.
Slinging Pipe Bundle - ANS Double basket provides best contact.
Two Blocking Definition - ANS When hook block reeved with more than 2 parts of line.
Personnel Platform Safety Devices - ANS Anti-two block warning device and boom length
indicator.
Load Indicator Measurement - ANS ASME: Actual load, radius, boom tip height.
Right Lever Function - ANS Controls boom movement.
Wire Rope Lay Length - ANS Distance of 6 rope diameters.
Rotation Resistant Rope Broken Wires - ANS 3 broken wires in 30 rope diameters.
Multi-Part Reeving Usage - ANS Utilized when line pull exceeds load.
Competent Person Definition - ANS Identifies hazards, can take corrective measures.
Outrigger Placement Near Wall - ANS At least half the depth of cellar wall below ground.
2 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED
QUESTIONS AND DETAILED ANSWERS.
EXPERT VERIFIED FOR GUARANTEED
PASS.
Boom Angle Calibration - ANS Calibrating using a protractor measuring 90 degrees from the
crane deck.
Outrigger Setup - ANS Crane tires on the ground firmly to support weight.
Hoisting Wind Speed - ANS Max 20 mph; competent person assesses safety to continue.
LMI System Disablement - ANS Only during assembly, disassembly, and load testing.
Two Audible Signals - ANS Operator intends to stop.
Dynamic Action Swinging Crane - ANS Radius decreases, load weight increases.
Leaving Cab Safety - ANS Operator restricts access, keeps crane in view.
Broken Wires Removal - ANS 2 broken wires in 6 rope diameters.
1 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED
, Stowing Load Position - ANS Where chart provides best stability configuration.
Choker Hitch Capacity - ANS Rated at 50% of vertical hitch capacity.
Signal Person Assignment - ANS Responsibility lies with the lift director.
Picking Points Location - ANS Above the center of gravity when attaching slings.
Slinging Pipe Bundle - ANS Double basket provides best contact.
Two Blocking Definition - ANS When hook block reeved with more than 2 parts of line.
Personnel Platform Safety Devices - ANS Anti-two block warning device and boom length
indicator.
Load Indicator Measurement - ANS ASME: Actual load, radius, boom tip height.
Right Lever Function - ANS Controls boom movement.
Wire Rope Lay Length - ANS Distance of 6 rope diameters.
Rotation Resistant Rope Broken Wires - ANS 3 broken wires in 30 rope diameters.
Multi-Part Reeving Usage - ANS Utilized when line pull exceeds load.
Competent Person Definition - ANS Identifies hazards, can take corrective measures.
Outrigger Placement Near Wall - ANS At least half the depth of cellar wall below ground.
2 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED