100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CSST EXAM ACTUAL EXAM 2026 | COMPLETE QUESTIONS WITH CORRECT ANSWERS | VERIFIED ANSWERS | BRAND NEW VERSION!

Rating
-
Sold
-
Pages
68
Grade
A+
Uploaded on
15-10-2025
Written in
2025/2026

This document serves as a comprehensive guide for students preparing for the CSST Exam in 2026, offering a complete set of questions with verified correct answers. The PDF is an invaluable resource for those seeking to understand the critical aspects of asbestos and safety regulations, including key regulations like SCAQMD Rule 1403, EPA/AHERA, and Cal-OSHA Title 8, 1529. It covers a wide range of topics, from regulatory requirements for containment and safety measures, to detailed insights into liability insurance types such as claims made versus occurrence-based insurance. Students will benefit from learning about essential industry practices, such as the recommended number of bulk samples to be collected according to AHERA guidelines, and the efficiency standards of HEPA filters, which are crucial for maintaining air quality in containment areas. Additionally, the document explains the purpose and application of payment bonds in ensuring contractor and subcontractor financial responsibility, as well as project management details like the required duration for keeping project records, which is up to 30 years post-employment.

Show more Read less
Institution
CSST 2026
Course
CSST 2026











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CSST 2026
Course
CSST 2026

Document information

Uploaded on
October 15, 2025
Number of pages
68
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

CSST EXAM ACTUAL EXAM 2026 | COMPLETE
QUESTIONS WITH CORRECT ANSWERS |
VERIFIED ANSWERS | BRAND NEW VERSION!

1. Which regulation requires viewing ports in containment, a master
shut off switch at the entry door for all negative air units, and fire-
retardant poly?
A. SCAQMD Rule 1403
B. EPA / AHERA
C. Cal-OSHA Title 8, 1529
D. None of the above ---------CORRECT ANSWER-----------------D. None of
the above




2. Which regulation has several appendix sections, one of which
consists of non-mandatory work practices?
A. Cal-OSHA Title 8, 1529
B. EPA ASHARA
C. EPA NESHAP
D. EPA AHERA ---------CORRECT ANSWER-----------------A. Cal-OSHA Title
8, 1529

,3. From which regulation does the term 'PACM' come from?
A. EPA AHERA
B. EPA NESHAP
C. Cal OSHA, Title 8, CCR 1529
D. Cal OSHA, Title 8, CCR 5144 ---------CORRECT ANSWER-----------------B.
EPA NESHAP




4. From which agency did the term asbestos containing construction
material (ACCM) come from?
A. EPA NESHAP
B. EPA AHERA
C. Fed OSHA CFR 1926, 1101
D. Cal-OSHA Title 8, 1529 ---------CORRECT ANSWER-----------------D. Cal-
OSHA Title 8, 1529




5. From which regulation does the term RACM (Regulated Asbestos
Containing Material) come from?
A. 29CFR,1926.1101
B. AHERA
C. NESHAP

,D. Cal-OSHA Title 8, 1529 ---------CORRECT ANSWER-----------------C.
NESHAP




6. What is the Cal OSHA definition of asbestos containing construction
material?
A. >.01 % by WT
B. 1% or more by WT
C. > .1% by WT
D. Less than 1% by WT ---------CORRECT ANSWER-----------------C. > .1%
by WT




7. What is the DTSC (Dept. of Toxic Substances Control) definition of
asbestos waste in California?
A. >.1 % by weight
B. 1 % or more by weight
C. > 1 % by weight
D. None of the above ---------CORRECT ANSWER-----------------B. 1 % or
more by weight

, 8. When can an AHERA trained supervisor/competent person,
employed by a state licensed asbestos removal contractor, collect up to
12 bulk samples, according to State of California regulations?
A. At any time on an asbestos removal project
B. On a residential project after they have taken a building inspector
course
C. Only a State of California CAC or CSST may collect samples
D. On a project less than 260 sq. ft. or 160 ln. ft. ---------CORRECT
ANSWER-----------------B. On a residential project after they have taken a
building inspector course




17. SCAQMD Rule 1403 requires an asbestos survey prior to demolition
in which type of structures?
A. All commercial building
B. Buildings with four units or more
C. All facilities
D. Only those with ACBM suspected ---------CORRECT ANSWER-------------
----C. All facilities




18. Which regulation created the course known as Supervisor?
A. EPA NESHAP
B. Cal-OSHA Title 8, 1529

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
nevilletadayo Capella University
View profile
Follow You need to be logged in order to follow users or courses
Sold
828
Member since
2 year
Number of followers
456
Documents
3144
Last sold
1 day ago
INVEST IN YOUR FUTURE EXCELLENCE TODAY!

Unlock Your Academic Success: Gain Access to Expertly Crafted Exams, Flash Cards, Test Banks, and Study Guides on this Premium Stuvia Account. Elevate Your Learning Experience and Achieve Top Grades with our Comprehensive and Time-Saving Resources.

4.6

315 reviews

5
247
4
37
3
14
2
6
1
11

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions