Questions and Answers 100%
Guaranteed Success | Already Rated A+
Clean Water Act - 🧠 ANSWER ✔✔1970s law that set into place the
regulation of stormwater
NPDES - 🧠 ANSWER ✔✔Requirements for managing stormwater activity
on a construction site are outlined in the following regulation
Immediately after the project award and before the general contractor
begins any site work - 🧠 ANSWER ✔✔Onsite stormwater pollution
prevention plan (SWPPP) binder should be put together by the general
contractor
Flushing a spill down the storm drain - 🧠 ANSWER ✔✔Which of the
following is not a beneficial use of water
, Discharge from contaminated ground water - 🧠 ANSWER ✔✔Which of the
following is never an allowable stormwater discharge from a construction
site.
All construction activity, inside and outside the building is complete and
permanent stabilization has been verified is adequate to meet permit
requirements - 🧠 ANSWER ✔✔The notice of termination (NOT) can be filed
when
All of the above - 🧠 ANSWER ✔✔You should have a SWPPP for
construction because
Site Specific - 🧠 ANSWER ✔✔A well designed SWPPP should be
After the SWPPP is prepared and before starting construction - 🧠 ANSWER
✔✔The stormwater notice of intent (NOI) must be submitted
All of the above - 🧠 ANSWER ✔✔Potential pollutant sources stored on a
construction site may include
Seek written approval from the project SWPPP designer and, if required,
the project owner - 🧠 ANSWER ✔✔If you believe stormwater BMP
modifications are necessary, you must