) 1. Which of the following is the primary purpose of a contractor licensing exam?
A. To test general intelligence
B. To ensure knowledge of construction laws and safety
C. To assess physical strength
D. To evaluate business marketing skills
Correct rationale: B – The licensing exam ensures that contractors understand construction
laws, safety, and professional standards.
2. What is the typical minimum experience required before applying for a contractor
license?
A. 6 months
B. 1 year
C. 2–5 years
D. 10 years
Correct rationale: C – Most jurisdictions require 2–5 years of practical experience in the trade
before licensing.
3. Which of the following is a key responsibility of a licensed contractor?
A. Preparing construction estimates
B. Supervising projects
C. Ensuring compliance with building codes
D. All of the above
Correct rationale: D – Licensed contractors handle estimates, supervise projects, and ensure
building code compliance.
4. Which of the following is considered a legal requirement for contractors?
A. Holding a valid license
B. Maintaining insurance
C. Paying taxes
D. All of the above
Correct rationale: D – Contractors must be licensed, insured, and tax-compliant.
5. What type of insurance is typically required for contractors?
A. Life insurance
B. Liability insurance
C. Travel insurance
D. Health insurance
,Correct rationale: B – Liability insurance protects the contractor against property damage and
injuries.
6. What is the purpose of a bid bond?
A. Guarantees the contractor will perform the work at the bid price
B. Insures against accidents on site
C. Covers the cost of materials
D. Provides worker benefits
Correct rationale: A – A bid bond assures the client that the contractor will honor the bid if
selected.
7. What does OSHA stand for in construction safety?
A. Occupational Safety and Health Administration
B. Official Safety and Hazard Authority
C. Occupational Security Hazard Agency
D. Office of Safety and Health Action
Correct rationale: A – OSHA sets safety standards to protect workers in construction.
8. Which of the following documents is critical for project approval?
A. Architectural drawings
B. Structural calculations
C. Permits from local authorities
D. All of the above
Correct rationale: D – All are essential for legal and safe construction.
9. Which of the following best defines a subcontractor?
A. A worker hired for daily labor
B. A contractor hired to perform a portion of the main contract
C. A supplier of materials
D. An inspector
Correct rationale: B – Subcontractors handle specific parts of a project under the main
contractor.
10. What is a lien in construction?
A. A type of construction material
B. Legal claim on property for unpaid work or materials
C. Safety equipment
D. A contract clause
Correct rationale: B – A lien allows contractors or suppliers to claim property if payment is not
made.
11. What is the main purpose of building codes?
A. To increase construction costs
B. To ensure structural safety and public welfare
C. To standardize design aesthetics
, D. To create delays in project approval
Correct rationale: B – Building codes protect occupants and ensure structural integrity.
12. Which of the following is a common method for project scheduling?
A. Gantt Chart
B. Flowchart
C. Pie Chart
D. Bar Graph
Correct rationale: A – Gantt charts are widely used for visual project timelines.
13. Which of the following is a key factor in contract negotiation?
A. Project scope
B. Payment terms
C. Timeline
D. All of the above
Correct rationale: D – Successful negotiation covers scope, payment, and schedule.
14. What is the primary purpose of a performance bond?
A. Ensures project completion according to contract
B. Guarantees material quality
C. Covers worker salaries
D. Provides tax incentives
Correct rationale: A – Performance bonds protect clients by ensuring contract fulfillment.
15. Which of the following is considered unethical for a contractor?
A. Overcharging clients
B. Using substandard materials
C. Ignoring safety regulations
D. All of the above
Correct rationale: D – Ethical contractors avoid overcharging, unsafe practices, and poor-
quality materials.
16. Which type of contract specifies a fixed price for the entire project?
A. Cost-plus contract
B. Lump-sum contract
C. Time and materials contract
D. Unit-price contract
Correct rationale: B – Lump-sum contracts set a fixed total price regardless of actual costs.
17. What is the primary role of a site supervisor?
A. Ordering materials
B. Supervising construction activities
C. Preparing contracts
D. Marketing the project
Correct rationale: B – Site supervisors manage daily construction activities and ensure
compliance with plans.