Exam Questions and Verified Answers |
Already Graded A+
What 10 code is transmitted for fire in a high rise MD? - 🧠 ANSWER ✔✔10-
77
What 10 code is transmitted for a fire in a high rise office building? - 🧠
ANSWER ✔✔10-76
What are the criteria for a mayday? - 🧠 ANSWER ✔✔I O U My Life.
Imminent collapse
Occurred collapse
Unresponsive member
Missing member
Lost member
, What are the criteria for an urgent transmission? - 🧠 ANSWER ✔✔BLIFE
Backing out (interior attack discontinued)
Loss of water
Injured member (non life threatening)
Fear of collapse
Fire in exposures
When stretching a 2nd line for a large store fire on the 1st floor of an OLT,
where is it positioned? - 🧠 ANSWER ✔✔When assured that it won't be
needed on the 1st floor it may be advanced to the floor above
Units arrive at 2 story flat roof PD with fire on the top floor. Which member
brings the 1st saw to the roof? - 🧠 ANSWER ✔✔2nd due Roof FF. Location
of fire does not matter for a flat roof, the 2nd due brings saw
When utilizing Positive Pressure Ventilation (PPV) to pressurize the attack
stairway at a fire operation, what is the optimum placement of the Positive
Pressure Fan (PPF)? - 🧠 ANSWER ✔✔4' to 6' from attack stairwell door on
the ground floor at an angle tilt of 80 degrees (remember keep fan a hook's
distance away)