Oregon Construction Contractors CCB Test EXAM
Questions & Answers, Well Elaborated | Already
Verified Test |100% Verified solutions | 2025\2026
Latest!!
Save
Terms in this set (400)
A person who engages in Oregon Water Resource Department (OWRD)
a business or activity that
involves construction new
water wells must possess
a license from the:
True or False True
Prompt billing and prompt
collections make for a
healthier cash flow.
Oregon OSHA consultants Issue citations or propose penalties for violations of
WILL NOT: OSHA standards.
https://quizlet.com/1079478542/oregon-construction-contractors-ccb-test-exam-questions-answers-well-elaborated-already-verified-test-100-verified… 1/100
,9/20/25, 7:28 AM Oregon Construction Contractors CCB Test EXAM Questions & Answers, Well Elaborated | Already Verified Test |100% Verified sol…
1) Questions to answer - All of these are questions to ask
when preparing your - What equipment will be needed?
project schedule include - How long will each task take to complete?
all of these except: - What type of crew will be needed to complete the
activity?
- All of these are
questions to ask
- What equipment will be
needed?
- How long will each task
take to complete?
- What type of crew will
be needed to complete
the activity?
For Notice of Right Lien A structure that is not used or intended for use as a
purpose, a commercial residential building
improvement is defined as:
I am the residential Mortgagee
original contractor and I
provide labor and
materials for the project.
Who do I need to give a
notice of Right to Lien to?
A quantity survey is also Take Off
referred to as a:
Tagout involves placing a On an energy-isolation device
warning tag:
Other than Take Off, other Ballpark Estimates
common construction
estimate types include all,
except:
https://quizlet.com/1079478542/oregon-construction-contractors-ccb-test-exam-questions-answers-well-elaborated-already-verified-test-100-verified… 2/100
,9/20/25, 7:28 AM Oregon Construction Contractors CCB Test EXAM Questions & Answers, Well Elaborated | Already Verified Test |100% Verified sol…
True or False True
An on-site of host
employer is responsible
for ensuring a safe place
of employment for leased
or temporary workers.
The state unemployment The history of unemployment claims against the
tax rate varies base on: employer.
- Any of these could be the result of failure to comply
with a stop work order.
Stop work order violations
- Court action
can result in:
- Permit or license revocation
- Civil penalties
The ___________________ gives an Invitation to Bid
overview of the project,
deadlines, and general
requirements.
"Job Logic" refers to: The sequence of work
True or False False
Self-employment taxes
apply to all forms of
business entities.
- Money earned and In the Cash Method
money spent are
accounted for in the year
they are received or paid,
respectively.
A complete and accurate estimate of project costs
The Itemized Summary is
and lists all major items of work in the order they are
the basis for:
to be performed.
A major difference One is federal and one is state
between the EIN and the
BIN is:
https://quizlet.com/1079478542/oregon-construction-contractors-ccb-test-exam-questions-answers-well-elaborated-already-verified-test-100-verified… 3/100
, 9/20/25, 7:28 AM Oregon Construction Contractors CCB Test EXAM Questions & Answers, Well Elaborated | Already Verified Test |100% Verified sol…
Poor construction and Molds and fungus
storage practices can
result in _________________
inside the structure walls.
Builders now must use Surrounding all interior bedroom doors.
corrosion-resistance
flashing in these specified
locations, except:
Compliance with - All of these are correct
environmental regulations - Private party lawsuits
can protect a contractor - Criminal and civil penalties
from: - Liability claims
- All of these are correct
- Private party lawsuits
- Criminal and civil
penalties
- Liability claims
Using the Quantity Take- Labor and materials
Off method for estimating,
you begin by estimating
the cost of _________________
for each individual task.
Contractors must apply Their local building department
for permits through:
A cost effective method JIT - Just In Time
for managing material
costs and keeping
inventory costs down is
the:
These are materials Unpainted and untreated scrap wood
prohibited form open
burning in Oregon except
for: