What part of the FAR is the FAR Part 7 (FAR 7.102)
acquisition plan?
If under $250k contracting officers must make every
What are the requirements for possible attempt to set aside for small businesses
a Small business set aside?
There must be at least 2 feasible small businesses that are able to
compete
When do you award a Firm Sealed bid contracts must be firm fixed price;
Fixed Price (FFP) appropriate for commercial items or detailed
contract? specifications or engineering drawings
When do you use a cost Only when performance involves such uncertainties that costs
reimbursable contract? can't be estimated
1. Full and open
What are the types of 2. Full and Open after exclusions
competition? 3. Not full and open
1. Full and open - FAR 6.1 (Sealed Bids, Competitive
Proposals, Combination of competitive
When would we use each of
procedures)
the types of competition? 2. Full and Open after exclusions - FAR 6.2 (Small business set
aside)
3. Not full and open - FAR 6.3 (Requires a J&A and shall
contain a reference to the specific authority that it
was awarded under)
What part of the FAR talks FAR 6 discusses the 3 levels of competition
about competition?
What a type is of economically 8(A) Program
disadvantaged business can
you do sole source?
What is the threshold for the $6.5 million for goods and services and $4 million for
8(A) program business set manufacturing government
aside?
/ 1/8
, 9/18/25, 7:09 PM AATC CON 1200
Who certifies the funds? Financial manager
What is the goal 23%
percentage of Army
dollars that go to a small
business?
1. MILCON (5 years)
2. Procurement (3 years)
What are the different colors
3. RDT&E (2 years)
of money?
4. O&M (1 year)
What is H291 product service Equipment and material testing
code?
When should you begin As soon as the agency need is identified, preferably
acquisition planning? well in advance of the fiscal year in which contract
award or order placement is necessary
Conducting adequate Acquisition Planning helps us
Why do we do acquisition
planning? achieve the guiding principles of the Federal Acquisition
System in FAR 7.102
1. Satisfy the customer in terms of cost, quality and
timeliness of the delivered product or service
What are the ultimate goals 2. Minimize administrative operating costs
are for acquisition planning? 3. Conduct business with integrity, fairness and openness
4. Fulfill public policy objectives
How much acquisition Very little, relatively simple planning.
planning is needed for a
small business or single
source?
FAR Part 11 "Describing Agencies Needs" requires in the following
What documents are order:
mandated by FAR 11? 1. Documents mandated for use by law
2. Performance-Oriented documents (PWS or SOO)
FAR 11 mandates we need to All types
do acquisition planning for
what type of acquisition?
Do we need to do acquisition Yes
planning for simple
purchase?
It is possible at the time of award to accurately estimate
When should we award fixed
price? the extent or duration of the work and anticipate
/ 2/8