Walmart - Stormwater Exam .
The SWPPP implementation sequence may be modified -
ANSWER-After consulting with the project SWPPP designer
(CEC) and if required the Project Owner after receiving written
approval.
A SWPPP Site Map will show all of the following except:
1. Locations and BMPs
2. Notices of Violation
3. Phasing and Sequence
4. Limits of Disturbance - ANSWER-2. Notices of Violation
Which of the following information is to be posted at the
entrance to the site?
1. Construction Site Notice
2. Permit authorization
3. Location of the SWPPP
4. All of the above - ANSWER-4. All of the above
, Which erosion control best management practice increases
water infiltration, dissipates rainfall energy, and slows overland
flow of stormwater? – ANSWER-Vegetation
Of the following factors that influence erosion rates, the one a
Contractor has
the most control
over is:
1. Soil
permeability
2.
Precipitation
3.
Topography
4. Groundcover - ANSWER-4.
Groundcover
The best location for portable toilets on your construction site
is - ANSWER-On
level ground, in low construction
traffic areas.
The following must be marked on Site Maps in the jobsite
trailer as works