LEVEL III PRACTICE EXAM 1|QUESTIONS WITH
100% CORRECT ANSWERS|GUARANTEED
PASS| LATEST 2025/2026
During installation of traffic loops in the pavement, which three statements apply prior to and
during the installation of loop wire? (Choose 3).
a) Do not allow vehicular traffic over an open saw cut.
b) Do not overlap saw cuts at the corner.
c) Thoroughly clean the saw cut of foreign material.
d) Use a plastic sleeve where loop wire crosses a joint.
a) Do not allow vehicular traffic over an open saw cut.
c) Thoroughly clean the saw cut of foreign material.
d) Use a plastic sleeve where loop wire crosses a joint.
On the reservoir side of a dam, erosion protection against wave action should extend up the
slope to at least which level?
a) crest of dam
b) maximum water elevation
c) minimum water elevation
,d) two-thirds the height of the dam
b) maximum water elevation
During stage construction while installing drainage, the contractor must complete which two of
the following tasks? (Choose two).
a) Bulk head the pipe until the system is complete.
b) Complete the entire system before it rains.
c) Maintain the existing drainage system until the new system is functional.
d) Provide temporary connections as needed to maintain the existing system.
c) Maintain the existing drainage system until the new system is functional.
d) Provide temporary connections as needed to maintain the existing system.
After flushing but before connecting a new main to the existing system, what test does an
inspector need to verify before placing the main into service?
a) bacteriological testing
b) cover testing
c) deflection testing
d) pressure testing
d) pressure testing
Which three types of inspections are completed for sign structures? (Choose three).
, a) final inspection
b) interim inspection
c) initial inspection
d) routine inspection
b) interim inspection
c) initial inspection
d) routine inspection
How many times per foot should loop lead-in wires be twisted?
a) 3 turns per foot
b) 5 turns per foot
c) 6 turns per foot
d) 7 turns per foot
b) 5 turns per foot
Which phrase is true of test reports required for concrete sidewalks, asphalt pavement,
concrete curb, and pipe culverts for rest areas?
a) 50% required on roadway contracts
b) required for federal-aid projects only
c) same as roadway contracts
d) submitted in duplicate
c) same as roadway contracts