FIRE ALARM LEVEL 1 EXAM LATEST 2025/2026 ACTUAL EXAM WITH
COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (100%
VERIFIED ANSWERS) |ALREADY GRADED A+| ||PROFESSOR
VERIFIED|| ||BRANDNEW!!!||
Where shall signals from carbon monoxide detectors be
indicated?
A) The building blueprint
B) The fire alarm control unit
C) The local fire department
D) The central monitoring station - ANSWER-B)
when describing a pull station, what does this the term "single
action" means?
A) only one force or motion is required for activation
B) only one station is installed on the circuit
C) The station can only be used once, then it must be replaced
D) The station requires lifting the cover for activation - ANSWER-
A) general knowledge
,2|Page
Cables installed under a corrugated metal roof deck must be
located at least which minimum distance from the roof deck?
A) 1.25 inches
B) .75 inches
C) 1.5 inches
D) 2 inches - ANSWER-C)
According to NFPA 72, A maximum of how many seconds shall
elapse from the initiation of a single fire alarm signal on an active
multiplex system until it is recorded at the station?
A) 15
B) 30
C) 60
D) 90 - ANSWER-D) 90 seconds
For initial acceptance test, what percentage of newly installed
smoke detectors and restorable heat detectors does NFPA
required to be tested?
A) 20% of smoke detectors; 10% of Heat
,3|Page
B) 50% of both devices
C) 100% of smoke detectors; 205 of Heat
D) 100% of both - ANSWER-D) 100% of both devices!
During fire alarm system installation, the wiring paths for
notification circuit or modified because of obstructions in the field.
According to NFPA 72, which of the following shall be included in
the as built drawings?
A) information on the type of obstructions
B) photos of the path changes
C) revised calculations showing any changes to installation
conditions
D) revised Record of completion noting the obstructions -
ANSWER-C)
Records of complete test and operations shall be kept for how
long?
A) as determined by the owner
B) until the next test and a period of 1 year thereafter
C) until the next test is performed
, 4|Page
D) until notified by the AHJ - ANSWER-B)
NFPA 72 14.6.2.1
For a new fire alarm system, who is responsible for completing
the Record of Completion?
A) AHJ
B) installing contractor
C) local fire department
D) system designer - ANSWER-B)
NFPA 72 7.5.6.2
According to OSHA, safety data sheet (SDS) shall included which
of the following indication information?
A) cost of the material
B) date of SDS printout
C) emergency phone number of manufacturer or importer
D) first-aid instructions for exposure - ANSWER-C)