100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

SDEP Stormwater NEWEST 2025/2026 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!!

Rating
-
Sold
-
Pages
7
Grade
A+
Uploaded on
10-09-2025
Written in
2025/2026

SDEP Stormwater NEWEST 2025/2026 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!!

Institution
SWM DEQ
Course
SWM DEQ









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
SWM DEQ
Course
SWM DEQ

Document information

Uploaded on
September 10, 2025
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • swm deq

Content preview

SDEP Stormwater

_____are the final line of protection and one of the most seen and upkeep-intensive BMPs
on an active production web site. - ANS-Perimeter controls

A _______is intended to divert overland sheet flow to a stabilized outlet or a
sediment-trapping facility at some stage in the status quo of permanent stabilization on
sloping, disturbed regions. - ANS-transient diversion berm

A detention basin is designed to save stormwater on website and then _________. -
ANS-Release at a managed price

A floating turbidity barrier/curtain is designed to ______sediment encumbered water and
permit enough _____for sediments to settle out of suspension. - ANS-Contain/Time

A paved flume should have hydrostatic alleviation holes when seasonal high water desk or
seepage from slopes is a challenge. - ANS-True

A silt fence should simplest be mounted for sediment seize under ______conditions. -
ANS-Sheet Flow

A stand of permanent grass plant life is taken into consideration hooked up after two mowing
activities. - ANS-False

A stand of plant life is taken into consideration fully established after how lengthy? - ANS-1
yr

A stormwater conveyance channel is a constructed waterway. What sort of lining have to it
have? - ANS-Erosion resistant

A transient sediment lure must have an preliminary storage extent of _____ cubic yards or
_____ cubic toes consistent with acre of drainage location, measured from the low point of
the floor to the crest of the gravel outlet? - ANS-134/three,six hundred

Along with clearing, grading and excavating, the FDEP has determined that _____
additionally meet the definition of creation activity. - ANS-demolition activities

An instance of a bodily effect of abrasion and sedimentation is: - ANS-Increased flooding.

An important principle of erosion and sediment manipulate is to implement an intensive
______ and _________program. - ANS-Maintenance & Follow-Up

An outlet protection device is designed to save you scour at shops and limit erosion
downstream by way of reducing the _____of concentrated stormwater flows. - ANS-Velocity

, Apply _______practices to save you excessive on-web page damage. - ANS-Erosion
Control

Before making use of topsoil, what have to be carried out to the subsoil to insure proper
bonding with the topsoil? - ANS-Discing and Scarifying

Best Management Practices (BMPs) are not essential for a site smaller than one acre. -
ANS-False

Best Management Practices (BMPs) for erosion and sedimentation control consist of which
of the subsequent? - ANS-Silt fence and soil stabilization.

BMP renovation sports can be labeled into classes which include __________. - ANS-All of
the above

Clogged fish gills and decreased mild for aquatic flora are examples of organic
consequences of abrasion and sedimentation. - ANS-True

Curb inlet safety gadgets have to have an overflow area on the way to prevent flooding. -
ANS-True

Dewatering techniques for managing nonstormwater discharges and disposing of
accumulated stormwater from depressed regions at a construction website consist of: -
ANS-All of the above

During production, how often should inlets, outlets, and other manage structures be
inspected? - ANS-Weekly (each 7 days) and After each 1/2" or greater rain storm

During Phase I of web site improvement even the smallest sites will require the installation of
practices previous to website online clearing and grading. - ANS-Perimeter Control

During the building production stage, worries for the inspector are: - ANS-Increased Traffic
and Excavation

Erosion is - ANS-The system by way of which the land surface is worn away through the
movement of wind, water, and gravity.

For a type III turbidity barrier set up, where are the anchor strains connected? - ANS-Buoy

For proper installation of a silt fence, a trench _____inches deep and ______inches wide
must be excavated. This will allow the _______inches of cloth to be buried. - ANS-four" D x
four" W; 8"

How lengthy does the operator should update or revise the stormwater pollution prevention
plan (SWPPP) when website online conditions have modified? - ANS-7 Days

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Qualityexam Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
60
Member since
1 year
Number of followers
2
Documents
1104
Last sold
1 hour ago

Welcome To my Store My Goal is to help you achieve your desired grades by providing credible study materials I'm happy to help you with quality documents On this page you will find quality study guides,Exams assignments, Research papers and Test Banks all verified correct . you'll find past and recent revised and verified study materials . Stay here and You'll find everything you need to pass !!! . I always ensure my documents are of high standards Be assured to get good grades and always leave a review after a purchase Refer a friend SUCCESS!!!!

Read more Read less
4.1

15 reviews

5
9
4
1
3
3
2
1
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions