100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

SWM DEQ NEWEST 2025/2026 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!!

Rating
-
Sold
-
Pages
8
Grade
A+
Uploaded on
10-09-2025
Written in
2025/2026

SWM DEQ NEWEST 2025/2026 ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+||BRAND NEW!!

Institution
SWM DEQ
Course
SWM DEQ









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
SWM DEQ
Course
SWM DEQ

Document information

Uploaded on
September 10, 2025
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • swm deq

Content preview

SWM DEQ

A locality VSMP authority need to encompass enforcement authority and a time table of civil
consequences for enforcement movements in its neighborhood ordinance. The maximum
penalty the authority can also problem is - ANS-$32,500 in keeping with violation per day

A locality VSMP should be at least as stringent as what kingdom permit? - ANS-Construction
GP

A simple rooftop disconnect isn't recommended for residential masses less than - ANS-6,000
feet^2

A violation of the development gp is a contravention of the - ANS-stormwater management
act

Accumulated sediment must be eliminated from the sediment forebay each - ANS-three to 5
years or whilst 6 to 12" have amassed

Adverse weather causing a scheduled inspection to be risky can postpone an inspection with
the aid of ____ - ANS-one enterprise day, BUT this ought to be cited inside the SWPPP

Any civil penalty assessed by a court as a result of a summons issued via a locality VSMP
authority ought to be paid - ANS-into the locality's treasury

Any man or woman who violates..... Will be situation to a civil penalty not to exceed -
ANS-$32, 500

Are assist sports covered below the Construction GP? - ANS-Yes, if it meets precise
standards

At a minimal, a stormwater control facility shall be inspected with the aid of the accountable
kingdom agency on an - ANS-annual basis and after any typhoon that causes the capacity of
the ability's important spillway to be handed

Can vegetated emergency spillways be built into fill? - ANS-No, needs to be armored if
constructed into fill

CBPA LDAs do not require - ANS-Construction GP, Pollution prevention Plan, Additional
manipulate measures to address TMDL

CBPA LDAs should have - ANS-accredited E&SC plan, authorized SWM plan, neighborhood
approval to begin land disturbance, long-term maintenance agreement, production report
drawings

, Changes within the SWPPP should be made in a __ day period - ANS-7

Chesapeake Bay Preservation Areas that result in a land disturbance more than or same to
____ and less than ____ - ANS-2,500 feet^2, 1 acre

Compliance necessities for channel safety rely on - ANS-type of channel being discharged to
and kind of flow

Concrete Wash Water must be directed into a - ANS-leak-proof field or leak-proof settling
basin

Corrective moves made based on inspections must be accomplished - ANS-as quickly as
viable but no later than seven days, or a longer time period as authorised by the VSMP

Date for the end of the economic year - ANS-October 1

DEQ has ___ days to finish evaluate of actual or capability inter-jurisdictional impacts upon
request - ANS-ninety

DEQ is needed to behavior a application evaluation once every - ANS-five years

DEQ is responsible for implementing the ____ even as locality ____ are accountable for
imposing local ordinances - ANS-Construction GP, VSMP

Difference among large and intensive for vegetated roof - ANS-extensive: low flora with
three" to six" boom medium, extensive medium 6 to 12"

Difference among degree 1 and stage 2 filtering practices - ANS-level 1 is a one cellular
design and level 2 is a two mobile layout

Difference among degree 1 and level 2 permeable pavement - ANS-for level 1, UD is
required

Difference among raise sizes for standard earthen embankment and component around pipe
- ANS-lift sizes for fashionable are 8", around the pipe are 4"

Difference in swale slopes for wet swale stage 1 and degree 2 - ANS-stage 1 swale slopes
much less than 2%, level 2 swale slopes much less than 1%

Dimensions of a soil compost amended filter out - ANS-20 feet lengthy and 10 ft wide

Does the SWM plan address runoff at some point of or after production? -
ANS-submit-production

Erosion and sediment control measures ought to be used whilst the soil compost amended
vicinity is what size? - ANS-2,500 toes^2 or greater

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Qualityexam Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
60
Member since
1 year
Number of followers
2
Documents
1104
Last sold
1 day ago

Welcome To my Store My Goal is to help you achieve your desired grades by providing credible study materials I'm happy to help you with quality documents On this page you will find quality study guides,Exams assignments, Research papers and Test Banks all verified correct . you'll find past and recent revised and verified study materials . Stay here and You'll find everything you need to pass !!! . I always ensure my documents are of high standards Be assured to get good grades and always leave a review after a purchase Refer a friend SUCCESS!!!!

Read more Read less
4.1

15 reviews

5
9
4
1
3
3
2
1
1
1

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions