100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ECCC GENERAL ENGINEERING EXAM WITH CORRECT QUESTIONS AND ANSWERS 2025

Rating
-
Sold
-
Pages
10
Grade
A+
Uploaded on
27-08-2025
Written in
2025/2026

ECCC GENERAL ENGINEERING EXAM WITH CORRECT QUESTIONS AND ANSWERS 2025

Institution
ECCC
Course
ECCC









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ECCC
Course
ECCC

Document information

Uploaded on
August 27, 2025
Number of pages
10
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ECCC GENERAL ENGINEERING EXAM
WITH CORRECT QUESTIONS AND
ANSWERS 2025

Construction Duration Classifications - CORRECT-ANSWERSContingency classifications:


Organic (up to 90 days), Initial (6 months), Temporary (5 years), Semi-permanent (2-10 Years)


Enduring Classification: permanent (5 years or longer)




When making a road, what is the reason that more than one layer or material is used? -


CORRECT-ANSWERSSave money because top layers cost more




Layers of a road - CORRECT-ANSWERSSurface


Base course


Sub base


select materials


compacted subgrade

, Two levels of quality control - CORRECT-ANSWERSUnit quality management program and


project quality management program




What are CDRs of construction units responsible for? - CORRECT-ANSWERSEstablishing and


using a company quality management program




performance work statement - CORRECT-ANSWERSa part of the Statement of Work that is


performance based and directly explains what the contractor is going to do




Steps to clearing and repairing a crater on the minimum operating strip (MOS) - CORRECT-


ANSWERS1. Clear area of debris (Air field clearance team with chem lights, e tools, etc) Clear


20 ft.


2. Conduct profile measurements. ID area of upheaval using line of sight method and


stanchions parallel to runway surface.


3. Remove debris with IHMEE, shovel or other dig asset.


4. Sort debris and stockpile away from MOS (30 ft away, no higher than 3 feet to ensure aircraft


clearance)
$15.89
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
nashshii2
3.0
(1)

Get to know the seller

Seller avatar
nashshii2 Liberty University
View profile
Follow You need to be logged in order to follow users or courses
Sold
3
Member since
5 months
Number of followers
0
Documents
802
Last sold
1 month ago

3.0

1 reviews

5
0
4
0
3
1
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions