Aggregate planning is capacity planning for: Select one: 1. the long range 2.
typically one or more years 3. typically one to three months 4. the short range 5.
the intermediate range - (answer)The intermediate range
The MRP input listing the assemblies, subassemblies, parts, and raw materials
needed to produce one unit of finished product is the:
A. master production schedule
B. bill-of-materials
C. inventory-records
D. assembly-time chart
E. net-requirements chart - (answer)Bill-of-materials
,2|Page
Which of the following most closely describes dependent demand? answer
following Select one: 1. net material requirements 2. estimates of demand using
regression analysis of independent variables 3. demand generated by suppliers 4.
derived demand 5. demands placed on suppliers by their customers -
(answer)Derived demand
Aggregate planners attempt to balance: Select one: 1. capacity and inventories 2.
demand and inventories 3. demand and costs 4. capacity and costs 5. capacity and
demand - (answer)capacity and demand
The output of MRP is: Select one: 1. inventory reorder points 2. net requirements
3. gross requirements 4. a schedule of requirements for all parts and end items 5.
economic order quantities and reorder points - (answer)a schedule of requirements
for all parts and end items
ERP implementation probably WILL NOT require: Select one: 1. cross functional
teams 2. frequent upgrades after installation 3. high funding for both initial cost
and maintenance 4. just a few weeks to install 5. intensive training - (answer)just a
few weeks to install
,3|Page
The multiplication process used by MRP to determine lower level requirements is
called: Select one: projecting 2. exploding 3. pegging 4. time-phasing 5.netting -
(answer)2. exploding
The direct result of disaggregating the aggregate plan is the: Select one: 1.
production plan x 2. material requirements plan 3. rough-cut capacity plan 4.
master schedule 5. marketing plan - (answer)master schedule
Which of these products would be most likely to have dependent demand? Select
one: 1. refrigerators 2 automobiles 3. brownies 4. televisions 5. automobile engines
- (answer)5. automobile engines
Which of the following best describes aggregate planning? Select one: 1. make or
buy decisions 2. the link between intermediate term planning and short term
operating decisions 3. a collection of objective planning tools 4. an attempt to
respond to predicted demand within the constraints set by product, process and
location decisions 5. manpower planning - (answer)4. an attempt to respond to
, 4|Page
predicted demand within the constraints set by product, process and location
decisions
An operations strategy for inventory management should work towards: Select
one: 1. increasing safety stocks 2. increasing lot sizes 3. increasing order quantities
4. decreasing lot sizes 5. decreasing service levels - (answer)decreasing lot sizes
Which of these products would be most apt to involve the use of a single-period
model? Select one: 1. calculators 2. fresh fish 3. gold coins 4. frozen corn 5.
hammers - (answer)fresh fish
The purpose of "cycle counting" is to: Select one: 1. reduce discrepancies between
inventory records and actual 2. reduce theft 3. count 10% of the items each month
4. count bicycles and motorcycles in inventory 5. count all the items in inventory -
(answer)1. reduce discrepancies between inventory records and actual