California UST Service Technician part
1exam with complete solutions
July 1 2005, service techs shall possess or work under someone who has a current
certification indicating he or she has passed the ? -ANSCalifornia UST service
technician exam
ICC cert must be renewed every? -ANS24 months
Service techs must posses or be employed by a person who has the appropriate
contractors license unless? -ANSThe individual has a Tank testing licens
Service tech is defined by any individual who? -ANSTest UST monitoring equipment
Trouble shoots UST systems
Installs UST monitoring equipment
If the manufacturer training no longer exist , the local angency may? -ANSApprove
comparable alternat training .
UST includes? -ANSTank and connected piping
What is considered and UST -ANSpetroleum storage tank
What UST system meets the requirements for secondary containment? -ANSDoubled
wall tanks
According to title 23; the following piping components if installed after July 1 1987 must
have secondary containment -ANSPressured product piping
Considered "pipe" on tanks installed after July 1 2003 -ANSPressured product piping
and below ground vapor recovery
Under dispenser containment (UDC) was required for all UST systems by -
ANSDecember 31 2003
System for exchanging gas vapors in a storage tank and product in a fuel delivery truck
-ANSStage 1 vapor recovery
An approved method for non visual monitoring for existing UST systems. -
ANSStatistical Inventory Reconciliation (SIR)
ATG must be capable for detecting a release of ? -ANS.2 gallons per hour
, Manual inventory reconciliation. -ANSNo longer an approved method for non visual
monitoring on existing UST systems
Automatic line leak detectors installed on underground piping with secondary
containment shall be capable of tetecting a leak of ? -ANS3 gallons per hour at 10 psi
ATG should be programmed to test the tank ? -ANSAt least monthly
According to PEI RP 300 a combustible gas can be used to ? -ANSDetect vapor leaks
in a vapor recovery system.
According to PEI RP 300. A written scope of work for vapor recovery installation should
include? -ANSConstruction plans
Positive shut off overfill protection device must stop the flow of fuel when the tank is no
more then ? -ANS95% full
According to EO VR 201 A What could cause a nozzle shut off mechanism or
malfunction? -ANSDepended filter seal damage
According to VR 201 A Breakaway reconnection must be ? -ANSLogged in GDF log
According to PEI RP 300 the following method of documenting piping location is NOT to
? -ANSSketch a diagram on the inside cover of vapor recovery equipment manual
According to PEI RP 300 as built drawing or pictures of the underground pipping and
other components shall be ? -ANSMaintained as long as UST is in service
According to EO VR 101 E maintance records are required to include? -ANSName and
designated UST operator .
The Phil-Tite EVR phase 1 system require that vapor vent pipes at any UST system be -
ANSUsed with no more then 3 p/v valves
According to EO VR 2010 after installing a new spout assembly in the Healy 900 nozzle
the following test must be conducted ? -ANSNozzle dispensing shut off test
According to Healy EO VR 201 A a vapor recovery record are to be maintained by? -
ANSGasoline dispensing facility operator
(GDF)
how many feet within a public drinking well require an enhanced leak detection test -
ANS1000 feet
What are the components of the Fire Triangle ? -ANSFuel Ignition source oxygen
1exam with complete solutions
July 1 2005, service techs shall possess or work under someone who has a current
certification indicating he or she has passed the ? -ANSCalifornia UST service
technician exam
ICC cert must be renewed every? -ANS24 months
Service techs must posses or be employed by a person who has the appropriate
contractors license unless? -ANSThe individual has a Tank testing licens
Service tech is defined by any individual who? -ANSTest UST monitoring equipment
Trouble shoots UST systems
Installs UST monitoring equipment
If the manufacturer training no longer exist , the local angency may? -ANSApprove
comparable alternat training .
UST includes? -ANSTank and connected piping
What is considered and UST -ANSpetroleum storage tank
What UST system meets the requirements for secondary containment? -ANSDoubled
wall tanks
According to title 23; the following piping components if installed after July 1 1987 must
have secondary containment -ANSPressured product piping
Considered "pipe" on tanks installed after July 1 2003 -ANSPressured product piping
and below ground vapor recovery
Under dispenser containment (UDC) was required for all UST systems by -
ANSDecember 31 2003
System for exchanging gas vapors in a storage tank and product in a fuel delivery truck
-ANSStage 1 vapor recovery
An approved method for non visual monitoring for existing UST systems. -
ANSStatistical Inventory Reconciliation (SIR)
ATG must be capable for detecting a release of ? -ANS.2 gallons per hour
, Manual inventory reconciliation. -ANSNo longer an approved method for non visual
monitoring on existing UST systems
Automatic line leak detectors installed on underground piping with secondary
containment shall be capable of tetecting a leak of ? -ANS3 gallons per hour at 10 psi
ATG should be programmed to test the tank ? -ANSAt least monthly
According to PEI RP 300 a combustible gas can be used to ? -ANSDetect vapor leaks
in a vapor recovery system.
According to PEI RP 300. A written scope of work for vapor recovery installation should
include? -ANSConstruction plans
Positive shut off overfill protection device must stop the flow of fuel when the tank is no
more then ? -ANS95% full
According to EO VR 201 A What could cause a nozzle shut off mechanism or
malfunction? -ANSDepended filter seal damage
According to VR 201 A Breakaway reconnection must be ? -ANSLogged in GDF log
According to PEI RP 300 the following method of documenting piping location is NOT to
? -ANSSketch a diagram on the inside cover of vapor recovery equipment manual
According to PEI RP 300 as built drawing or pictures of the underground pipping and
other components shall be ? -ANSMaintained as long as UST is in service
According to EO VR 101 E maintance records are required to include? -ANSName and
designated UST operator .
The Phil-Tite EVR phase 1 system require that vapor vent pipes at any UST system be -
ANSUsed with no more then 3 p/v valves
According to EO VR 2010 after installing a new spout assembly in the Healy 900 nozzle
the following test must be conducted ? -ANSNozzle dispensing shut off test
According to Healy EO VR 201 A a vapor recovery record are to be maintained by? -
ANSGasoline dispensing facility operator
(GDF)
how many feet within a public drinking well require an enhanced leak detection test -
ANS1000 feet
What are the components of the Fire Triangle ? -ANSFuel Ignition source oxygen