Edition by Phil Simmons
All Chapters Covered 1-21| Verified Questions & accurate Solutions
for Exam Preparations| A+ GRADED
110 |10 P10a
10g10 e
,210 |10 P10a1
0g10e
,Solution1 0 and1 0 Answer1 0 Guide
CHAPTER1 0 1:10COMMERCIAL1 0 BUILDING1 0 PLANS1 0 AND1 0 SPECIFICATIONS
TABLE1 0 OF1 0 CONTENTS
Review .......................................................................................................................................................... 1
Note10to10instructor:10It10is10recommended10that10students10be10required10to10respond,10where10
appropriate,10with10answers10that10are10complete10sentences.
REVIEW
Refer10to10the10National10Electrical10Code10or10the10working10drawings10when10necessary.10
Where10applicable,10responses10should10be10written10in10complete10sentences.
1. What1 0 section10of1 0 a1 0 commercial10building’s1 0 specification10contains1 0 a1 0 list
1 0 of1 0 contract10documents?
Answer:1 0 A1 0 list1 0 of1 0 the1 0 contract1 0 documents1 0 is1 0 contained1 0 in1 0 General1 0 Cla
uses1 0 and10Conditions.1 0 A1 0 listing1 0 of1 0 the1 0 Commercial1 0 Building1 0 contract1 0 docu
ments1 0 is1 0 presented1 0 in10this10chapter1 0 under1 0 the10heading10―Commercial10Building1
0Plans.‖10 The10instructor10may10wish10to10have1 0 the1 0 students1 0 check1 0 over1 0 this1 0 listi
ng1 0 and1 0 compare1 0 it1 0 with1 0 the1 0 plans1 0 provided.
2. The10requirement10for10temporary10light10and10power10at10the10job10site10will10be10 found10in10what
portion10of10a10commercial10building’s10specification?
Answer:10The10Supplementary10General10Conditions10specifies10the10job10site10require
ments10for10temporary10light10and10power.10In10some10contracts,10this10electrical10syst
em10becomes10the10responsibility10of10the10general10contractor;10in10other10contracts,10i
t10is10the10electrical10contractor’s10responsibility10to10install10and10maintain10the10tempo
rary10electrical10system.10The10instructor10may10wish10to10refer10the10student10to10NEC
10Article1059010and10discuss10the10requirements 10in10detail.
310 |10 P10a1
0g10e
, 3. The10electrician10uses10the10Schedule10of10Working10Drawings10for10what10purpose?
Answer:1 0 The1 0 electrician1 0 uses10the1 0 Schedule1 0 of1 0 Working1 0 Drawings10to1 0 deter
mine1 0 whether10all10of10the10drawings10are10at10hand.10The10information10on10―the10ot
her10sheets‖10may10be10very10important,10especially10in10coordinating10with10other10contr
actors.
4. Complete10the10following10items10by10indicating10the10letter(s)10designating10t
he10correct10source(s)10of10information:
No. Answer Item Information
4. Sections Ceiling10height Sections,1 0 Sheet1 0 A6
5. Electrical Electrical10receptacl Electrical10symbol10schedule,10Chapter10
10symbol e10style 2,1 0 Figure102–6
10schedu
le
6. Electrical Electrical10outl Electrical10layout10drawings,10Sheets
10layout1 et10location 10El,10E2,10and10E3
0drawing
s
7. Elevations1 0 Exterior10 wall10 finishes Elevations,1 0 Sheets1 0 A41 0 and1 0 A5
8. Site1 0 plan Grading10 elevations Site10 plan,1 0 Sheet10 A4
9. Electrical Panelboard1 0 schedules Electrical1 0 layout1 0 drawings,1 0 Sheet1 0 E4
10layout1
0drawing
s
10. Architectural Room10width
10floor10plan Architectural10floor10plan,10Sheets
10Al,10A2,10and10A3
11. Architectural Swing1 0 of1 0 door Architectural10floor10plan,10Sheets10Al,10A2,
10floor10plan and10A3
12. Sections View10of10 interior10 wall Sections,1 0 Sheet1 0 A6
Match10the10items10on10the10left10with10those1 0 on10the10right10by10writing10the10letter10des
ignation10of10the10appropriate10organization10from10the10list10on10the10right.
410 |10 P10a1
0g10e