Project Management C722, Pre-Assessment UPDATED ACTUAL Exam Questions and CORRECT Answers A project was authorized as an operational necessity to repair a design flaw in the date field on a computer system that constrains the year number to two digits instead of permitting the year to be indicated with four digits. During execution of the activity concerned with identifying the affected software, five relevant software modules were discovered that had not been included in the scope baseline. The project team must adjust the baselines to include the omitted scope.

Show more Read less
Institution
WGU C722
Course
WGU C722










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
WGU C722
Course
WGU C722

Document information

Uploaded on
August 16, 2025
Number of pages
25
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Project Management C722, Pre-Assessment
UPDATED ACTUAL Exam Questions and
CORRECT Answers
A project was authorized as an operational necessity to repair a design flaw in the date field on a
computer system that constrains the year number to two digits instead of permitting the year to
be indicated with four digits. During execution of the activity concerned with identifying the
affected software, five relevant software modules were discovered that had not been included in
the scope baseline. The project team must adjust the baselines to include the omitted scope.


Which change management phase does this scenario describe?


a) Preparing for the change
b) Managing the change
c) Reinforcing the change

d) Upgrading the change - CORRECT ANSWER - a) Preparing for the change


A general contractor is managing a highway construction project that will repair a flood-
damaged road. The Department of Transportation offered an incentive fee if the repairs are
completed early. Therefore, the project manager has established a rewards and recognition
program and has communicated this program to the project team member. The project's
recognition program will reward project team members who add value by accelerating the
project while maintaining its ability to deliver the completed scope correctly.


Which change management phase does this scenario describe?


a) Preparing for the change
b) Managing the change
c) Reinforcing the change

d) Upgrading the change - CORRECT ANSWER - c) Reinforcing the change

,A general contractor is managing a construction project that will add a new conference room to
an existing office building. The project was documented in a fixed-price contract that specified a
completion date. The contract includes a damages clause imposing a late completion penalty if
the conference room is not ready for use by the due date. One month into the implementation, the
customer wants to modify the room's lighting equipment. The requested change will delay the
project's critical path by three months.


Which process should be used to maintain the existing baseline?


a) Using a change management system to influence performance
b) Absorbing the change request in the baselines for time and cost
c) Focusing on the original scope

d) Using the risk management system to process change requests - CORRECT ANSWER -
a) Using a change management system to influence performance


A general contractor from Germany is managing a construction project in Norway that will add a
new conference room to an existing office building. The project needs to collect requirements
from the client prior to developing plans to build the new conference room.


Which two actions would prove useful to plan the project's quality?


a) Defining traceable and verifiable requirements that can be validated at project closure
b) Establishing metrics that describe what to measure and how to measure it
c) Using inventory to protect against defects during project implementation
d) Changing the work plan to account for the project experiencing common variation
e) Using slogans and numerical quotas to exhort resources to work harder - CORRECT
ANSWER -a&b


a) Defining traceable and verifiable requirements that can be validated at project closure
b) Establishing metrics that describe what to measure and how to measure it

, What is the name for the closing task where all project activities are reviewed to determine what
went right and what went wrong?


a) Closeout review
b) Lessons learned review
c) Client deliverables review

d) Project manager review - CORRECT ANSWER - b) Lessons learned review


What is another name for lessons learned review that is often used by the military and other
uniformed services?


a) Rules of engagement
b) Activity report
c) Protocol assessment

d) After action report - CORRECT ANSWER - d) After action report


The customer of a project validates that scope has been completed for the second of three
segments of the project.


Which closure practice does this describe?


a) Iteration completion
b) Phase completion
c) Deliverable completion

d) Stage completion - CORRECT ANSWER - d) Stage completion


The customer of a project validates that the project scope has been completed, all invoices have
been paid, and the expected benefits have been realized.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES Stanford University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1047
Member since
1 year
Number of followers
100
Documents
68977
Last sold
2 hours ago
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3.8

166 reviews

5
72
4
30
3
42
2
8
1
14

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions