100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

MISY 5340 EXAM 2 JIM UPDATED WITH MOST TESTED QUESTIONS AND ANSWERS | GRADED A+ | ASSURED SUCCESS WITH DETAILED RATIONALES

Rating
-
Sold
-
Pages
13
Uploaded on
14-08-2025
Written in
2025/2026

MISY 5340 EXAM 2 JIM UPDATED WITH MOST TESTED QUESTIONS AND ANSWERS | GRADED A+ | ASSURED SUCCESS WITH DETAILED RATIONALES

Institution
MISY 5340
Course
MISY 5340









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
MISY 5340
Course
MISY 5340

Document information

Uploaded on
August 14, 2025
Number of pages
13
Written in
2025/2026
Type
Exam (elaborations)
Contains
Unknown

Content preview

ESTUDYR



MISY 5340 EXAM 2 JIM UPDATED WITH MOST TESTED
QUESTIONS AND ANSWERS | GRADED A+ | ASSURED
SUCCESS WITH DETAILED RATIONALES
1. Which of the following are key organizational data relevant to the production process?
A. Company Code ✅
B. Credit Control Area
C. Client ✅
D. Storage Location ✅
E. Plant ✅
Rationale: Client, Company Code, Plant and Storage Location are standard organizational levels
used in production and inventory processes.

2. The master data relevant to the production process are:
A. Work Centers ✅
B. Material Masters ✅
C. Bill of Materials (BOM) ✅
D. Client
E. Company Code
Rationale: Work centers, material masters and BOMs define how products are manufactured.

3. Which of the following are statuses that can apply to a BOM?
A. On
B. Off
C. Active ✅
D. Inactive ✅
E. Open
Rationale: BOMs are typically marked active/inactive to control their usage.

4. What are the basic time elements in the production process?
A. Setup Time ✅
B. Alternate time
C. Build Time
D. Teardown time ✅
E. Processing time ✅
Rationale: Setup, processing (run) time, and teardown (cleanup) are core production time
elements.

5. Which of the following can be included in processing time?
A. Machine time ✅
B. Configuring work center

, ESTUDYR


C. Configuring equipment
D. Labor Time ✅
E. Setup Time
Rationale: Processing time covers machine and labor activities that actually produce the part
(not setup).

6. Which of the following are the general classifications of time elements in production?
A. Floating
B. Volatile
C. Fixed ✅
D. Explosive
E. Variable ✅
Rationale: Time elements are commonly classified as fixed (constant per setup) or variable
(scale with quantity).

7. The material master is grouped into different views or segments based on which factors?
A. Processes that use the material ✅
B. Material Type ✅
C. Organizational level ✅
D. Material Composition
E. Material description
Rationale: Material master views are organized by process needs, material type and
organization (plant/storage).

8. Examples of production resource tools are:
A. Raw materials
B. Fixtures ✅
C. Engineering drawings ✅
D. Calibration instruments ✅
E. Warehouse building
Rationale: PRTs (production resource tools) include fixtures, drawings, instruments used in
operations.

9. A planned order is a formal request that indicates:
A. How many units of a product are needed ✅
B. Where the finished goods are to be shipped
C. What materials are needed ✅
D. Where the raw materials are stored
E. When the materials are needed ✅
Rationale: Planned orders specify quantity, component needs and timing for production
planning.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Estudyr Kaplan University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1157
Member since
3 year
Number of followers
828
Documents
10870
Last sold
2 days ago
ESTUDY

Get best related and owned assignment help online, this is your youngest Proffesor around.Be Smart! , I will be sharing all materials, Nclex, study guides, tests, Question ,Answers and Rationales , test banks, Hesi questions, etc. on my page for , All are based on my experiences with Nursing school.| Feel free to message me with any questions, happy to help!

3.9

208 reviews

5
103
4
43
3
27
2
11
1
24

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions