A full lot of super pave asphalt is what size? 1,000 tons 1,000 to 2000 tons 2000 to 4000 tons 1 days production 2000 to 4000 tons Which is not typically used as an asphalt binder in fdot mix designs? PG 52-28 PG 58-22 PG 62-22 PG 76-22(PMA) PG 82-22 (PMA) PG 62-22 Who cuts the density cores used for verification testing? The verification technician The contractor The independent verification testing technician None of the above The contractor 8/8/25, 3:41 PM Asphalt Paving Level 1 Flashcards | Quizlet sublots and 4 cores per lot T/F False What is the most important for consistent compaction of asphalt mix? The mix is hotter in temperature The mix is colder in temperature The mix is uniform in temperature Temperature of the mix does not affect compaction The mix is uniform in temperature Referring to general stationing guidelines, R1 would be ____ than R2 Closer to centerline Closer to outside shoulder Closure to the inside shoulder Both A and C Both A and C While using the rolling straightedge, if the needle goes in the red zone indicating an unacceptable high spot in the section, you then Mark the pavement where the needle first goes into the red zone and place another mark where the needle leaves the red zone and continue 8/8/25, 3:41 PM Asphalt Paving Level 1 Flashcards | Quizlet slabs, the 15 foot manual straightedge should be set so ____ is on the bridge deck. 1 inch Exactly 1/2 of the straightedge The entire straightedge None of the above 1 inch For the first transverse joint on a project place the ___ on the new pavement while overlapping the transverse joint by one inch. 4 foot level 15 foot manual straight edge Rolling straightedge All the above 15 foot manual straight edge When calibrating to check the low side of the rolling straight edge: Place shims under the outer wheels Place the rolling straight edge on a surface that looks flat Place a 3/16 inch shin under each outside wheel, the gauge should read zero on both sides of the gauge Place shims under the center wheel Place a 3/16 inch shin under each outside wheel, the gauge should read zero on both sides of the gauge

Show more Read less
Institution
Asphalt Paving Level 1
Course
Asphalt Paving Level 1









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Asphalt Paving Level 1
Course
Asphalt Paving Level 1

Document information

Uploaded on
August 8, 2025
Number of pages
11
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

8/8/25, 3:41 PM Asphalt Paving Level 1 Flashcards | Quizlet




Asphalt Paving Level 1

Save




Terms in this set (32)


A full lot of super pave 2000 to 4000 tons
asphalt is what size?
1,000 tons
1,000 to 2000 tons
2000 to 4000 tons
1 days production

Which is not typically used PG 62-22
as an asphalt binder in
fdot mix designs?
PG 52-28
PG 58-22
PG 62-22
PG 76-22(PMA)
PG 82-22 (PMA)

Who cuts the density The contractor
cores used for verification
testing?
The verification technician
The contractor
The independent
verification testing
technician
None of the above




https://quizlet.com/1064600392/asphalt-paving-level-1-flash-cards/?new 1/11

, 8/8/25, 3:41 PM Asphalt Paving Level 1 Flashcards | Quizlet


A full lot is composed of 5 False
sublots and 4 cores per
lot T/F

What is the most The mix is uniform in temperature
important for consistent
compaction of asphalt
mix?
The mix is hotter in
temperature
The mix is colder in
temperature
The mix is uniform in
temperature
Temperature of the mix
does not affect
compaction

Referring to general Both A and C
stationing guidelines, R1
would be ____ than R2
Closer to centerline
Closer to outside shoulder
Closure to the inside
shoulder
Both A and C

While using the rolling Mark the pavement where the needle first goes into
straightedge, if the needle the red zone and place another mark where the
goes in the red zone needle leaves the red zone and continue
indicating an
unacceptable high spot in
the section, you then




https://quizlet.com/1064600392/asphalt-paving-level-1-flash-cards/?new 2/11
$13.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
quizletquizizzy

Get to know the seller

Seller avatar
quizletquizizzy Cambridge Institute Of Allied Health & Technology
View profile
Follow You need to be logged in order to follow users or courses
Sold
7
Member since
1 year
Number of followers
0
Documents
517
Last sold
3 weeks ago
latest papers

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions