ICC Masonry EXAM (2025) QUESTIONS AND
(elaborated) WITH COMPLETE SOLUTIONS
Save
Terms in this set (81)
Which of the following is ASTM C 90; RCMCI 6th Edition, Section 2.2.1
the standard specification
for loadbearing
concrete masonry units?
Which of the following Super plasticizer; RCMCI 6th Edition, Section 2.11.6
grout admixtures is used
to obtain a high
slump with reduced
water?
Which of the following is ASTM C 1386; CI 530; Part 2, Section 2.3E. IBC
the standard specification 2103.3
that autoclaved aerated
concrete masonry units
must conform to for the
strength class specified in
the contract documents?
Grout intended for use in ASTM C 476; 2006 IBC 2103.12
the construction of
engineered and
empirically designed
masonry structures must
comply with
https://quizlet.com/1064406344/icc-masonry-exam-2025-questions-and-elaborated-with-complete-solutions-flash-cards/ 1/14
, 07/08/2025, 13:20 ICC Masonry EXAM (2025) QUESTIONS AND (elaborated) WITH COMPLETE SOLUTIONS Flashcards | Quizlet
The slump test for grout ASTM C 1019; ASTM - C1019-03
must be performed in
accordance with
In what condition are Damp; ASTM - 1019-03
grout specimens to be
tested?
When the prism test 28; 2006 IBC 2105.3.1
method is being utilized,
how long must the
prisms cure prior to being
cut?
After construction and 48 hours; ASTM - C 1314, Section 5.10
grouting, masonry test
prisms should not be
disturbed or moved for a
minimum of
When field sampling 15 minutes; ASTM - C1019, Section 7.2.1
grout, the elapsed time
between obtaining the
first and final portions of
the sample shall not be
more than
If mortar compression 1; RCMCI 6th Edition, 3.2.4
tests are required, how
many tests per day are to
be taken for the three
successive work days at
the start of the job?
Glass unit masonry shall 60 degrees F; 2006 IBC 2104.3.2.1
not be laid at
temperatures below
https://quizlet.com/1064406344/icc-masonry-exam-2025-questions-and-elaborated-with-complete-solutions-flash-cards/ 2/14
ICC Masonry EXAM (2025) QUESTIONS AND
(elaborated) WITH COMPLETE SOLUTIONS
Save
Terms in this set (81)
Which of the following is ASTM C 90; RCMCI 6th Edition, Section 2.2.1
the standard specification
for loadbearing
concrete masonry units?
Which of the following Super plasticizer; RCMCI 6th Edition, Section 2.11.6
grout admixtures is used
to obtain a high
slump with reduced
water?
Which of the following is ASTM C 1386; CI 530; Part 2, Section 2.3E. IBC
the standard specification 2103.3
that autoclaved aerated
concrete masonry units
must conform to for the
strength class specified in
the contract documents?
Grout intended for use in ASTM C 476; 2006 IBC 2103.12
the construction of
engineered and
empirically designed
masonry structures must
comply with
https://quizlet.com/1064406344/icc-masonry-exam-2025-questions-and-elaborated-with-complete-solutions-flash-cards/ 1/14
, 07/08/2025, 13:20 ICC Masonry EXAM (2025) QUESTIONS AND (elaborated) WITH COMPLETE SOLUTIONS Flashcards | Quizlet
The slump test for grout ASTM C 1019; ASTM - C1019-03
must be performed in
accordance with
In what condition are Damp; ASTM - 1019-03
grout specimens to be
tested?
When the prism test 28; 2006 IBC 2105.3.1
method is being utilized,
how long must the
prisms cure prior to being
cut?
After construction and 48 hours; ASTM - C 1314, Section 5.10
grouting, masonry test
prisms should not be
disturbed or moved for a
minimum of
When field sampling 15 minutes; ASTM - C1019, Section 7.2.1
grout, the elapsed time
between obtaining the
first and final portions of
the sample shall not be
more than
If mortar compression 1; RCMCI 6th Edition, 3.2.4
tests are required, how
many tests per day are to
be taken for the three
successive work days at
the start of the job?
Glass unit masonry shall 60 degrees F; 2006 IBC 2104.3.2.1
not be laid at
temperatures below