For hot work operation with citywide permit, the owner of the premises of the
hot work operation areas must be notified in writing by the citywide permit
holder ______ the hot work is to be started. - (ANSWER)at least 48 hours before
The pre-hot work check must be conducted by the responsible person before hot
work is authorized and __________ - (ANSWER)least once per day.
The check reports must be kept at the work site during the work, made available
for inspection by a representative of the FDNY, and maintained on the premises
for a minimum of - (ANSWER)48 hours after work is complete.
A pre-hot work check must be conducted at least - (ANSWER)once per day
Hot work operations involving cutting or welding shall be conducted at least -
(ANSWER)35 feet from combustible materials and combustible waste
All other hot work operations shall be conducted at least - (ANSWER)25 feet from
combustible materials and combustible waste
Sprinkler system protection ____________while hot work is performed. -
(ANSWER)must not be shut off or impaired
& Correct Answers.
For hot work operation with citywide permit, the owner of the premises of the
hot work operation areas must be notified in writing by the citywide permit
holder ______ the hot work is to be started. - (ANSWER)at least 48 hours before
The pre-hot work check must be conducted by the responsible person before hot
work is authorized and __________ - (ANSWER)least once per day.
The check reports must be kept at the work site during the work, made available
for inspection by a representative of the FDNY, and maintained on the premises
for a minimum of - (ANSWER)48 hours after work is complete.
A pre-hot work check must be conducted at least - (ANSWER)once per day
Hot work operations involving cutting or welding shall be conducted at least -
(ANSWER)35 feet from combustible materials and combustible waste
All other hot work operations shall be conducted at least - (ANSWER)25 feet from
combustible materials and combustible waste
Sprinkler system protection ____________while hot work is performed. -
(ANSWER)must not be shut off or impaired