Having the right structures for internal and external personnel to make sure the
project team is keeping on top of tracking is important for:
a) owner's project requirements
b) recertification
c) meeting minimum program requirements
d) current facilities requirements - 🧠 ANSWER ✔✔Recertification
,Continuous tracking is critical to the success of recertification
- LEED Process -
What detail in a tracking system are important for recertificaiton?
a) number of desk
b) newer versions of LEED
c) number of FTEs
d) minimum occupancy reqs. - 🧠 ANSWER ✔✔number of FTEs
These are additional inputs to ENERGY STAR that need to be tracked over time in
case the values shift. The quantities and dates of any changes need to be
documented to get accurate results
- LEED Process -
A project team for a school is preparing for recertification. During the performance
period no major changes have occurred. What will the project team need to submit
for review?
, 3
a) site management policies
b) site infrastructure information
c) purchasing policies
d) only performance documentation - 🧠 ANSWER ✔✔only performance
documentation
unless major changes have occur (as defined by renovation, addition or
management turnover) only performance docs. needs to be submitted for
recertification
- LEED Process -
What is the max gap a project can have in between performance periods?
a) none
b) 1 full week
c) 3 months
d) 8 months - 🧠 ANSWER ✔✔1 full week
- LEED Process -
COPYRIGHT©PROFFKERRYMARTIN 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE.
PRIVACY STATEMENT. ALL RIGHTS RESERVED
, Unless otherwise noted in the credit requirements how long is the initial
performance period?
a) at least 12 months but no longer than 5 yrs
b) at least 3 mo. but no more than 24 months
c) at least 12 months
d) at least 8 months but no longer than 36 months - 🧠 ANSWER ✔✔At least 3
months but no more than 24 months
- LEED Process -
All performance periods must overlap and conclude within how may days of each
other?
a) 7 days
b) 30 days
c) 10 days
d) 3 months - 🧠 ANSWER ✔✔30 days
- LEED Process -
A project has the following credits and end dates for their performance periods: