Verified Answers | Already Graded A+
what are the two compliance paths for indoor water use reduction credits - 🧠
ANSWER ✔✔ 1. Prescriptive path
2. performance path
The three goals of the integrated approach - 🧠 ANSWER ✔✔1. developers mission
2. project environmental setting
3. project community context
Who are the members of the project team? - 🧠 ANSWER ✔✔1. Applicant acting as
team leader
2. multidisciplinary group of desing professionals
3. Local supporting partners
,10 steps of the LEED work plan - 🧠 ANSWER ✔✔1. Identify project site and
prepare preliminary development program
2. Select rating system
3. Assemble project team and identify relevant organizations
4. check minimum program requirements and prerequisites
5. finalize project boundary and development program
6. reconfirm minimum program requirements and prerequisites compliance
7. develop LEED scorecard
8. Assign roles and responsibilities
9. develop consistent documentation (base mapping, cross-cutting calculations)
10. perform quality assurance review and submit for certification
kinds of sites - 🧠 ANSWER ✔✔1. previously developmed
2. Infill site
Adjacent site
How do you know if something is considered previously developed? - 🧠 ANSWER
✔✔atleast 75% previously developed land
, 3
what is the previously developed exception for small- sites? - 🧠 ANSWER
✔✔May Consider lots of less than one acre if a building was constructed
somewhere on the lot because it prevents teams from having to individually assess
small home lots to determine the amount of land use the building footprint versus
yard space.
What is the definition of an infill site? - 🧠 ANSWER ✔✔At least 75% of its
boundary borders parcels that individually are at lest 50% previously developed,
and that aggregate are at least 75% previously developed
how do you calculate infill site? - 🧠 ANSWER ✔✔You divide the area that is
previously developed by the total area. Then you take the previously developed
area of qualifying parcels by the total area of qualifying parcels. Then you take the
perimiter length that is adjacente to the qualifying parcels divided by the total
perimiter length minus the length of waterfront perimeter to get the % of perimiter
adjacent to qualifying parcels.
what are the considerations for an adjacent site? - 🧠 ANSWER ✔✔- If the project
site is next to a street right-of-way, the team must consider the previous
development status of property on the other side.
What is the development timeline? - 🧠 ANSWER ✔✔1. Getting the property
COPYRIGHT©PROFFKERRYMARTIN 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE.
PRIVACY STATEMENT. ALL RIGHTS RESERVED
, 2. preproject conditions
3. existing conditions
4. build-out
what are three maps used in mapping? - 🧠 ANSWER ✔✔1. project site
2. vicinity
3. special maps
how do you measure walking and bicycling distances? - 🧠 ANSWER ✔✔distance
a pedestrain or bicyclist would travel from an origin point to the closest destination
of a given , such as closest bus stop.
dwelling or business accessed through common building entries are counted
according to the number of dwelling units or busineess establishments reach
through such entrances
two ways to count occupants - 🧠 ANSWER ✔✔daily averages
peak totals