100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

RPB390 Epic Certification questions with accurate answers.

Rating
-
Sold
-
Pages
38
Grade
A+
Uploaded on
29-07-2025
Written in
2024/2025

RPB390 Epic Certification questions with accurate answers.

Institution
Epic
Course
Epic











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Epic
Course
Epic

Document information

Uploaded on
July 29, 2025
Number of pages
38
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

RPB390 Epic Certification questions with accurate
answers
1. What is the import spec used to import Fee Schedules in Chronicles?
Choose ONLY one:
A. Fee Schedule, 100
B. FSC,1300
C. FSC, 200
D. FSG, 1200 Ans✓✓✓ B. FSC,1300


4. The difference between the price of the charge and what the payer
agrees that you should be able to collect is $13.00. This is the
________________. Choose only ONE answer.


A. Allowed Amount
B. Expected Reimbursement Amount
C. Billed Amount
D. Not Allowed Amount Ans✓✓✓ D. Not Allowed Amount


A charge posts with a price of $77.00, this is the _______. Choose only
one answer.


A. Allowed Amount
B. Expected Reimbursement Amount
C. Billed Amount

,D. Not Allowed Amount Ans✓✓✓ C. Billed Amount


Allowed amount Ans✓✓✓ The maximum amount an insurer will pay for
any given service.


Actual collectable amount on the EOB from a payer.


Anesthesia billing Ans✓✓✓ Anesthesia billing uses many variables when
assigning a price to a charge. In order to correctly assign prices, there is
required fee schedule, procedure, and anesthesia pricing record setup.


Anesthesia billing also uses a conversion factor. The conversion factor is
the dollar amount per unit that the system multiplies by the quantity of
the procedure when pricing anesthesia charges.


Batch Scheduler Ans✓✓✓ a tool that automates many tasks in the system
(like claims and statement processing)


Benefits/challenges of reimbursement contracts Ans✓✓✓ Pros:
Increased reporting capabilities
Helpful in negotiations with payers
Auto‐populating allowed amounts in Payment Posting
Ability to route underpayments to work queues for follow‐up


Cons:

,Requires time commitment to set up and maintain
Increased usage = increased maintenance ﴾the more you build, the more
you have to maintain﴿
Information is only as accurate as you make it


Billed amount Ans✓✓✓ total amount charged for a service


The price of a charge sent out on the claim to the payer


Build a line the MPPR table


EXAMPLE: Payer adheres to CMS's standards in regards to Multiple
Cardiovascular Procedures. Because the technical component has fewer
overhead fees, you will be reimbursed less for the second charge.
Ans✓✓✓ 1. In Classic, make sure you're on the Further Reductions tab of
your contract
2. In the CMS MPPR Rule field, enter "Cardiovascular Rule".
3. In the Technical Component % Reimbursement field enter, "75".
4. Save your contract.


Component Ans✓✓✓ Group common records together
Used to define services/procedures in contracts
Can be reused

, Component group Ans✓✓✓ Used to combine components to further
define services


Configure the Batch Scheduler


EXAMPLE: You need to configure the Batch Scheduler to run and re‐
evaluate all of the charges you posted earlier. Ans✓✓✓ 1. Navigate to the
Professional Billing Programmer Menu in Text
2. From the Professional Billing Programmer Menu in Text, go to Other
System Modules > Batch Scheduler > Job Enter/Edit. 3. At the Job
prompt, enter " 1404 Job".
4. At the Would you like to create a new Job? field, enter "Yes".
5. Click ENTER to allow the system to assign the job an ID.
6. Click ENTER to accept the name.
7. In the Template to use: field, enter template "1404" and press ENTER
twice to accept that template.
8. PAGE DOWN to the Single and Multiple Response Values screen.
9. Enter "No" in the !ALL QUEUED CONTRACTS value.
10. In the CONTRACT ID mnemonic, enter " Payer Reimbursement
Contract".
11. Enter "2" into the !Charge Date Type value.
12. Enter "1" into the Only Re‐Calculate Expected Amounts field.
13. SHIFT + F7 to leave your job.
14. PAGE UP back to the Batch Scheduler Main Menu.
15. Choose Batch Enter/Edit.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
cracker Chamberlain School Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
2003
Member since
3 year
Number of followers
1342
Documents
46675
Last sold
1 day ago
✨ Cracker – Verified Study Powerhouse

Welcome to your shortcut to academic and certification success. I'm Cracker, a trusted top seller I specialize in high-quality study guides, test banks, certification prep, and real-world exam material all tailored to help you pass fast and score high.

3.8

366 reviews

5
162
4
84
3
49
2
22
1
49

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions