All of the following items should be on hand to react to a spill except?
Class A fire extinguisher
Which is not a component of a Healy phase II vapor recovery system?
Universal 37
Which of the following is not part of the hanging hardware?
Husky model 4885
What is mounted on the top of the manifold vent mast?
Pressure/vacuum vent cap
According to VR-201-A, a __________________ should be installed on the Healy
system if the flow rate us above 10 GMP?
Flow limiter
The quarterly inspection and Testing of a Healy Phase II EVR system should include
the following except?
Conduct a pressure decay test by a Healy Certified Technician - EO VR_-201-A
The first sign of oxygen depletion is?
Accelerated breathing and heartbeat
According to the PEI 500, a method of removing a portion of a facility from service
are, except?
Noting in defective equipment log
, 2
What procedure checks the integrity of the vapor check valve in the nozzle?
Nozzle bag test
Which of the following conditions is a Healy certified technician NOT required to
repair?
Reconnection of a breakaway after a drive off
During the annual inspection and testing of the vapor recovery system; the first
three steps are to:
i. Conduct static pressure performance of the Healy Clean air separator
ii. Conduct pressure decay test
iii. Conduct dispenser vapor line tightness test
iiii. ...?
What is the Fourth step?
Conduct V/L test on all nozzles
What procedure is required after a nozzle spout change?
Nozzle automatic shutoff test
A vapor recovery system generally uses what unit of measurement?
Inches of water
What is the lower limit of acceptable V/L for a nozzle?
.95
What organization does a technician have to be certified with to perform
maintenance on vapor recovery systems?
ICC- Title 23 2715
The clean air separator belongs to which system?
Healy Phase II EVR
VAPOUR RECOVERY ICC PRACTICE TEST 1 EXAM NEWEST
VERSION -2025/2026- 100+ QUESTIONS AND VERIFIED
ANSWERS 100% CORRECT GUARANTEED SUCCESS
All of the following items should be on hand to react to a spill except?
Class A fire extinguisher
Which is not a component of a Healy phase II vapor recovery system?
Universal 37
Which of the following is not part of the hanging hardware?
Husky model 4885
What is mounted on the top of the manifold vent mast?
Pressure/vacuum vent cap
According to VR-201-A, a __________________ should be installed on the Healy
system if the flow rate us above 10 GMP?
Flow limiter
The quarterly inspection and Testing of a Healy Phase II EVR system should include
the following except?
Conduct a pressure decay test by a Healy Certified Technician - EO VR_-201-A
The first sign of oxygen depletion is?
Accelerated breathing and heartbeat
According to the PEI 500, a method of removing a portion of a facility from service
are, except?
Noting in defective equipment log
, 2
What procedure checks the integrity of the vapor check valve in the nozzle?
Nozzle bag test
Which of the following conditions is a Healy certified technician NOT required to
repair?
Reconnection of a breakaway after a drive off
During the annual inspection and testing of the vapor recovery system; the first
three steps are to:
i. Conduct static pressure performance of the Healy Clean air separator
ii. Conduct pressure decay test
iii. Conduct dispenser vapor line tightness test
iiii. ...?
What is the Fourth step?
Conduct V/L test on all nozzles
What procedure is required after a nozzle spout change?
Nozzle automatic shutoff test
A vapor recovery system generally uses what unit of measurement?
Inches of water
What is the lower limit of acceptable V/L for a nozzle?
.95
What organization does a technician have to be certified with to perform
maintenance on vapor recovery systems?
ICC- Title 23 2715
The clean air separator belongs to which system?
Healy Phase II EVR