100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

VAPOUR RECOVERY ICC PRACTICE TEST 1 EXAM NEWEST VERSION -2025/2026- 100+ QUESTIONS AND VERIFIED ANSWERS 100% CORRECT GUARANTEED SUCCESS

Rating
-
Sold
-
Pages
8
Grade
A+
Uploaded on
29-07-2025
Written in
2024/2025

VAPOUR RECOVERY ICC PRACTICE TEST 1 EXAM NEWEST VERSION -2025/2026- 100+ QUESTIONS AND VERIFIED ANSWERS 100% CORRECT GUARANTEED SUCCESS

Institution
Course









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Course

Document information

Uploaded on
July 29, 2025
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

1


VAPOUR RECOVERY ICC PRACTICE TEST 1 EXAM NEWEST
VERSION -2025/2026- 100+ QUESTIONS AND VERIFIED
ANSWERS 100% CORRECT GUARANTEED SUCCESS



All of the following items should be on hand to react to a spill except?
Class A fire extinguisher
Which is not a component of a Healy phase II vapor recovery system?
Universal 37
Which of the following is not part of the hanging hardware?
Husky model 4885
What is mounted on the top of the manifold vent mast?
Pressure/vacuum vent cap
According to VR-201-A, a __________________ should be installed on the Healy
system if the flow rate us above 10 GMP?
Flow limiter
The quarterly inspection and Testing of a Healy Phase II EVR system should include
the following except?
Conduct a pressure decay test by a Healy Certified Technician - EO VR_-201-A
The first sign of oxygen depletion is?
Accelerated breathing and heartbeat
According to the PEI 500, a method of removing a portion of a facility from service
are, except?
Noting in defective equipment log

, 2


What procedure checks the integrity of the vapor check valve in the nozzle?
Nozzle bag test
Which of the following conditions is a Healy certified technician NOT required to
repair?
Reconnection of a breakaway after a drive off
During the annual inspection and testing of the vapor recovery system; the first
three steps are to:
i. Conduct static pressure performance of the Healy Clean air separator
ii. Conduct pressure decay test
iii. Conduct dispenser vapor line tightness test
iiii. ...?
What is the Fourth step?
Conduct V/L test on all nozzles
What procedure is required after a nozzle spout change?
Nozzle automatic shutoff test
A vapor recovery system generally uses what unit of measurement?
Inches of water
What is the lower limit of acceptable V/L for a nozzle?
.95
What organization does a technician have to be certified with to perform
maintenance on vapor recovery systems?
ICC- Title 23 2715
The clean air separator belongs to which system?
Healy Phase II EVR
$17.98
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
aceacademics
5.0
(1)

Get to know the seller

Seller avatar
aceacademics Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
2
Member since
8 months
Number of followers
0
Documents
1108
Last sold
3 months ago

5.0

1 reviews

5
1
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions