100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

3RD Class Stationary Steam Engineer License – Prep Exam Questions and Answers – Complete Certification Study Material (100% Correct)

Rating
-
Sold
-
Pages
19
Grade
A+
Uploaded on
29-07-2025
Written in
2024/2025

This document contains a comprehensive set of multiple-choice and fill-in-the-blank questions and answers designed to prepare candidates for the 3rd Class Stationary Steam Engineer License exam. It covers topics such as boiler operation, steam systems, combustion, safety protocols, feedwater treatment, draft systems, and turbine operation. All answers are marked and verified, making this a complete and accurate study aid for exam preparation.

Show more Read less
Institution
Systems Engineering
Course
Systems Engineering










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Systems Engineering
Course
Systems Engineering

Document information

Uploaded on
July 29, 2025
Number of pages
19
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

3RD Class Stationary Steam Engineer License
Prep Exam Questions And Answers 100%
Correct

_________ are necessary for complete combustion - time, temperature, mixture, and atomization


if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ - 214.7


a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 398 PSI. The
blowdown is______psi - 12


an oil cooler is commonly used with a(n) ________ when operating in conjunction with a
turbogenerator - steam turbine


a boiler is producing 40,000lb of steam/hr at a pressure of 100 PSI and a steam temperature of 500
degrees Fahrenheit. The steam produced is _______ steam - superheated


the economizer on a boiler is used to _______ - add heat to the feed water


blowers are normally used with________ boilers - water tube


overheating of tubes on a boiler can be caused by________ - scale on tubes


carbon dioxide in a condensate return system causes_________ - channeling


a ________ pump is a positive displacement pump - reciprocating


a boiler generating 6000 lb of steam/hr produces _______btu/hr - 6,000,000




,a bottom blowdown is performed on a boiler to _____ - discharge sludge and sediment


water columns are connected to the boiler with a minimum of _______" pipe - 1


the minimum size of a water column blowdown valve is_______". - 3/4


the maximum size bottom blowdown valve on a boiler is_________". - 2 1/2


a ________ allows condensate to pass through, but stops Steam. - a steam trap


when taking over a shift, the first thing to do is check the________ - water level in each boiler


according to the asme code, a high-pressure boiler having more than 500 square feet of heating
surface shall have________ - two or more safety valves


the probable cause of an increase in temperature of gases of combustion at the boiler Outlet is____ -
dirty heating services


boilers in battery equipped with________ must have two main steam stop valves and a free-flowing
drain between them - manhole openings


in order to be sure the gauge glass is indicating an accurate water level reading, the stationary
engineer should______ - blowdown the gauge glass


a continuous blowdown line is located___ - in the Steam and water drum well below the nowl


a temperature reading of 80 degrees Celsius is equal to_________°f - 176


a chimney temperature of 250 degrees Fahrenheit above steam temperature indicates_______ - poor
efficiency


a manometer is red in________ - inches of water


, the boiling point of water will____ with an increase in pressure - be raised


if a lather is not obtained when performing a soap hardness test, the water sample is_______ - hard


combustion efficiency can be increased when air is________ - preheated


______ draft is produced by a fan located between the boiler and the chimney - induced


the overspeed trip on a steam turbine should be tested ______ - before putting the steam turbine online


a high CO2 reading in the gases of combustion is a sign of____ - High combustion efficiency


the purpose of chemically treating feedwater is to________ - turn scale-forming salts to a non adhering
sludge


water in a d rating feed water heater is prevented from entering the steam line by a(n) _______. - Loop
seal or internal overflow


a steam turbine operating at 3600 RPM will trip at_________ rpm - 3960


he steam line going to The Blowers is connected to the main ________ - steam drum


before using blowers on a boiler,________ - drain set blower lines


an accumulation of snow on the Fireside of a boiler tubes________ - decreases boiler efficiency


a globe valve installed in the feed water line between the feed water pump and boiler has a pressure
from the feed water pump_________ the valve disc - under


the range of a pressure gauge should be twice the safety valve setting, but not less than______ time (s)
the safety valve setting - 1 1/2
$13.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
johnwayne1

Get to know the seller

Seller avatar
johnwayne1 Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
1
Member since
7 months
Number of followers
3
Documents
115
Last sold
2 months ago
study hub

We are here to support you every step of the way in your academic journey, whether it's test practice, homework assistance, research guidance, data analysis, or any other form of reliable tutoring you require. Our primary goal is to provide our students with top-notch education that paves the way for excellent grades. Please don't hesitate to reach out with any questions, and we welcome your suggestions.

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions