Which of the following aspects of the continuous delivery pipeline
focuses on understanding customer needs?
A. Continuous Exploration
B. Continuous Deployment
C. Continuous Integration
D. Release on Demand - ANSWER-A. Continuous Exploration
What is one of the tools associated with Design Thinking?
A. Set based design
B. Portfolio canvas
C. Empathy maps
D. Behavior-driven development - ANSWER-C. Empathy maps
,2|Page
Which of the following roles act as proxies for the customer in
representing their needs to the teams?
A. Developer roles
B. Executive roles
C. Architectural roles
B. Product roles - ANSWER-B. Product roles
What is "precisely specify value by product" central to?
A. SAFe Principles
B. Agile Manifesto
C. SAFe Core Values
D. Lean Thinking - ANSWER-D. Lean Thinking
What does the ART planning board show?
A. Risks
,3|Page
B. Significant dependencies
C. Capacity and load
D. Epics - ANSWER-B. Significant dependencies
What is one way to quickly address impediments to flow?
A. Review burn-down charts
B. Raise visibility of effects outside of ART control
C. Identify them on the Planning Board
D. Wait for the next Inspect and Adapt event - ANSWER-B. Raise
visibility of effects outside of ART control
The Scrum Master/Team Coach wants to establish a team's initial
capacity. The team has two testers, three developers, one full-
time Scrum Master/Team Coach, and a Product Owner split
between two teams. What is their capacity before calculating for
time off?
A. 32
, 4|Page
B. 52
C. 40
D. 48 - ANSWER-C. 40
Why is it important for teams to understand the optimum batch
size for their work?
A. to determine the correct cadence
B. To make value flow
C. To understand transaction costs
D. To complete more work - ANSWER-B. To make value flow
What is the purpose of building a continuous delivery pipeline?
A. To prioritize development speed over system stability
B. To identify key stakeholders within the system architecture
C. To prioritize system stability over development speed