NCCER/OSHA Scaffold SG
Study online at https://quizlet.com/_8l4tub
1. The footing or anchorage for scaffolds must be capa- Tying or guying
ble of carrying the maximum intended load without:
2. Erectors of a scaffold who exposed to potential falling Over head protection
object hazards shall be provided with:
3. Osha requires a rest landing at intervals not exceed: 35 feet
4. The top handrail of a scaffold must be able to with- 200
stand how many pounds of pressure?
5. When Building a scaffold inside a "goggle area" Everyone inside the area
must wear goggles
6. The ladder should be located on a mobile scaffold will tip over
not
7. When should ties be installed? During the erection
process
8. What body produces the primary Code or regulations OSHA (Occupational Safe-
guiding the scaffolding industry? ty and Healthy Agency)
9. What should be used to erect scaffolding on uneven Leveling Jacks
ground?
10. OSAH specifically prohibits the use of? Lean to scaffolds
11. Boards or wooden pad placed on the soil to support Mudsills
scaffold legs are?
12. The tube of a tube and clamp scaffold is normally what 1.9 Inches
size O.D.?
13. 12
, NCCER/OSHA Scaffold SG
Study online at https://quizlet.com/_8l4tub
Scaffold decks that overlap a minimum of how many
inches, unless secured in some other way?
14. the bearer in a tube and clamp scaffold is always? Placed above the adjacent
runner.
15. What must a rolling scaffold have on each caster or Positive locking device
roller?
16. Who must inspect a scaffold each work shift and after Competent person
any occurrence which could effect a scaffold's struc-
tural integrity?
17. What is the minimum tensile strength of D-rings and 5,000 pounds
snap hooks on a safety harness?
18. What part of the picture is identified by the letter "G"? Sill or mudsill
19. what part of the scaffold is identified by letter "A"? Guardrail
20. What part of the scaffold is identified by the letter "C"? Runner
21. What part of the scaffold is identified by the letter "F"? Base plate
22. When is it allowed to notch out scaffold planks to "Never"
make them fit?
23. When erecting a scaffold, the screw jack fir the ad- 12 Inches
justable leg base should not extend more than how
many inches?
24. Which of the following should be used to safely secure #9 tie wire and toe boards
scaffold boards to the platform?
25. Competent person
Study online at https://quizlet.com/_8l4tub
1. The footing or anchorage for scaffolds must be capa- Tying or guying
ble of carrying the maximum intended load without:
2. Erectors of a scaffold who exposed to potential falling Over head protection
object hazards shall be provided with:
3. Osha requires a rest landing at intervals not exceed: 35 feet
4. The top handrail of a scaffold must be able to with- 200
stand how many pounds of pressure?
5. When Building a scaffold inside a "goggle area" Everyone inside the area
must wear goggles
6. The ladder should be located on a mobile scaffold will tip over
not
7. When should ties be installed? During the erection
process
8. What body produces the primary Code or regulations OSHA (Occupational Safe-
guiding the scaffolding industry? ty and Healthy Agency)
9. What should be used to erect scaffolding on uneven Leveling Jacks
ground?
10. OSAH specifically prohibits the use of? Lean to scaffolds
11. Boards or wooden pad placed on the soil to support Mudsills
scaffold legs are?
12. The tube of a tube and clamp scaffold is normally what 1.9 Inches
size O.D.?
13. 12
, NCCER/OSHA Scaffold SG
Study online at https://quizlet.com/_8l4tub
Scaffold decks that overlap a minimum of how many
inches, unless secured in some other way?
14. the bearer in a tube and clamp scaffold is always? Placed above the adjacent
runner.
15. What must a rolling scaffold have on each caster or Positive locking device
roller?
16. Who must inspect a scaffold each work shift and after Competent person
any occurrence which could effect a scaffold's struc-
tural integrity?
17. What is the minimum tensile strength of D-rings and 5,000 pounds
snap hooks on a safety harness?
18. What part of the picture is identified by the letter "G"? Sill or mudsill
19. what part of the scaffold is identified by letter "A"? Guardrail
20. What part of the scaffold is identified by the letter "C"? Runner
21. What part of the scaffold is identified by the letter "F"? Base plate
22. When is it allowed to notch out scaffold planks to "Never"
make them fit?
23. When erecting a scaffold, the screw jack fir the ad- 12 Inches
justable leg base should not extend more than how
many inches?
24. Which of the following should be used to safely secure #9 tie wire and toe boards
scaffold boards to the platform?
25. Competent person