F60 Fireguard test / Strategies Review of Key Quizzes & Correct
F60 Fireguard test
AnswersStudy online at https://quizlet.com/_76ah9x
1. For hot work operation with city- at least 48 hours before
wide permit, the owner of the
premises of the hot work oper-
ation areas must be notified in
writing by the citywide permit
holder ______ the hot work is to
be started.
2. The pre-hot work check must least once per day.
be conducted by the responsible
person before hot work is autho-
rized and __________
3. The check reports must be kept 48 hours after work is complete.
at the work site during the work,
made available for inspection by
a representative of the FDNY,
and maintained on the premises
for a minimum of
4. A pre-hot work check must be once per day
conducted at least
5. Hot work operations involving 35 feet from combustible materials and combustible waste
cutting or welding shall be con-
ducted at least
6. All other hot work operations 25 feet from combustible materials and combustible waste
shall be conducted at least
7. Sprinkler system protection must not be shut off or impaired
____________while hot work is
performed.
1/4
F60 Fireguard test
AnswersStudy online at https://quizlet.com/_76ah9x
1. For hot work operation with city- at least 48 hours before
wide permit, the owner of the
premises of the hot work oper-
ation areas must be notified in
writing by the citywide permit
holder ______ the hot work is to
be started.
2. The pre-hot work check must least once per day.
be conducted by the responsible
person before hot work is autho-
rized and __________
3. The check reports must be kept 48 hours after work is complete.
at the work site during the work,
made available for inspection by
a representative of the FDNY,
and maintained on the premises
for a minimum of
4. A pre-hot work check must be once per day
conducted at least
5. Hot work operations involving 35 feet from combustible materials and combustible waste
cutting or welding shall be con-
ducted at least
6. All other hot work operations 25 feet from combustible materials and combustible waste
shall be conducted at least
7. Sprinkler system protection must not be shut off or impaired
____________while hot work is
performed.