100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

SAFe POPM 6.0 EXAM BANK NEWEST 2025 ACTUAL EXAM WITH COMPLETE 130 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) ALREADY GRADED A+ | GUARANTEED PASS

Rating
-
Sold
-
Pages
48
Grade
A+
Uploaded on
27-06-2025
Written in
2024/2025

SAFe POPM 6.0 EXAM BANK NEWEST 2025 ACTUAL EXAM WITH COMPLETE 130 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) ALREADY GRADED A+ | GUARANTEED PASS What is one benefit of constant customer feedback? A) Fast learning cycles B) It reduces the need for face-to-face collaboration C) Teams can better align working days with a customer's schedule D) It reduces the amount of changes to the Features - Correct Answer > A) Fast learning cycles

Show more Read less
Institution
SAFe POPM 6.0
Course
SAFe POPM 6.0











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
SAFe POPM 6.0
Course
SAFe POPM 6.0

Document information

Uploaded on
June 27, 2025
Number of pages
48
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

SAFe POPM 6.0 EXAM BANK NEWEST 2025 ACTUAL
EXAM WITH COMPLETE 130 QUESTIONS AND CORRECT
DETAILED ANSWERS (VERIFIED ANSWERS) ALREADY
GRADED A+ | GUARANTEED PASS



What is one benefit of constant customer feedback?
A) Fast learning cycles
B) It reduces the need for face-to-face collaboration
C) Teams can better align working days with a customer's schedule
D) It reduces the amount of changes to the Features - Correct Answer > A) Fast
learning cycles


Which statement describes the Scaled Agile Framework?
A) It scales Scrum to multiple Agile Teams
B) It provides guidelines for Project Managers
C) It provides strict guidelines for all daily activities
D) It synchronizes alignment, collaboration, and delivery for large
numbers of teams - Correct Answer > D) It synchronizes alignment,
collaboration, and delivery for large numbers of teams

,The Work-in-Process limit at the Analyzing step of the ART Kanban is
based on the overall availability of Product Management, other subject
matter experts, and the capacity of which two other roles? (Choose
two.)
A) Lean Agile Center of Excellence
B) Release Train Engineer
C) Business Owners
D) System Architects
E) Agile Portfolio Operations - Correct Answer > C) Business Owners
D) System Architects


Features in ART Backlogs can result from what?
A) Decomposing Enabler Stories
B) Splitting Epics or Capabilities
C) Aggregating stories into Features
D) Refining the Team Backlog - Correct Answer > B) Splitting Epics or
Capabilities


Which statement is true about fast feedback?
A) It supports SAFe Lean-Agile Principle #3 - Assume variability, preserve
options
B) The shorter the feedback cycle, the higher the utilization

,C) It accelerates planning and delivery
D) Smaller batch sizes enable faster feedback loops - Correct Answer > A) It
supports SAFe Lean-Agile Principle #3 - Assume variability, preserve
options


Which two types of items are maintained in the Team Backlog? (Choose
two.)
A) Business Epics
B) Enabler Stories
C) User Stories
D) PI Objectives
E) Epic Enablers - Correct Answer > B) Enabler Stories
C) User Stories


Product Managers are expected to collaborate in planning the amount
of upcoming Enabler work by establishing what?
A) Team Backlog prioritization
B) Capacity allocation
C) Accurate user story sizing
D) Completed Epic acceptance criteria - Correct Answer > B) Capacity allocation

, The team is struggling to agree on the story point sizing of a new user
story. The PO was previously a related domain expert and feels the
team is wasting time. What should she do?
A) Instruct the SM to resize the story
B) Continue to support the team's decision on sizing
C) Make the team aware of her expertise and decide the size for them
D) Suggest the team stop the sizing of the user story and add it to the
next iteration as is - Correct Answer > B) Continue to support the team's
decision on sizing


True or False: Epics are estimated in story points rolled up from feature
estimates
A) True
B) False - Correct Answer > A) True


How frequently should the ART Backlog be reviewed?
A) Every week
B) When the Epic owners are defining the Epic Value Statement
C) Continuously
D) Before every PI - Correct Answer > C) Continuously


The first three elements of the Continuous Delivery Pipeline work
together to support delivery of small batches of new functionality.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Starshine1 Devry University
View profile
Follow You need to be logged in order to follow users or courses
Sold
298
Member since
3 year
Number of followers
124
Documents
4573
Last sold
1 week ago
HIGH SCORE ACHIEVERS

I am dedicated and knowledgeable expert specializing in Health care, Nursing, Mathematics, Psychology, History, Physics and Biology. Simple well-researched education material for you. My work contains updated and latest Exam solutions, Notes and Study guide Correctly 100% verified. Good Luck with your Studies!

3.8

46 reviews

5
22
4
9
3
8
2
0
1
7

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions