100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Nutanix NCP-MCI-6.10 Dumps (V8.02) with Real Exam Questions - Enhance Your Achievement

Rating
-
Sold
1
Pages
20
Grade
A+
Uploaded on
19-06-2025
Written in
2024/2025

DumpsBase comes with the expertly designed Nutanix NCP-MCI-6.10 dumps (V8.02), developed to help you achieve the Nutanix Certified Professional - Multicloud Infrastructure v6.10 exam with self-belief and promptness. The NCP-MCI-6.10 exam dumps are formulated by industry-certified experts who closely follow the latest course outline and layout. These NCP-MCI-6.10 real exam questions help you mirror the real test, allowing you to manage your time better and discern areas for improvement. With DumpsBase Nutanix NCP-MCI-6.10 exam dumps, you'll have everything you need to succeed on the actual exam on your first try. #NCP-MCI-6.10

Show more Read less
Institution
Self Learning
Course
Self Learning










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Self Learning
Course
Self Learning

Document information

Uploaded on
June 19, 2025
Number of pages
20
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

DUMPS
BASE
EXAM DUMPS

NUTANIX
NCP-MCI-6.10
28% OFF Automatically For You

Nutanix Certified Professional - Multicloud
Infrastructure (NCP-MCI v6.10)

,1.The customer expects to maintain a cluster runway of 9 months.
The customer doesn’t have a budget for 6 months but they want to add new
workloads to the existing cluster.




t
en
m
ve
ie
ch
A
r
ou
Y
ce
Based on the exhibit, what is required to meet the customer's budgetary timeframe?


an
nh
A. Add resources to the cluster.
B. Postpone the start of new workloads. -E
ns
io
st



C. Delete workloads running on the cluster.
ue
Q




D. Change the target to 9 months.
m
xa




Answer: A
lE
ea




Explanation:
R
h
it




The exhibit shows that the overall runway is only 66 days, meaning that the current
w
2)




cluster does not have enough capacity to sustain workloads for 6 months, let alone 9
0
8.
(V




months.
ps
um




The best solution is to add resources to the cluster (Option A), such as CPU, memory,
D




or storage, to extend the runway.
10
6.
I-




Postponing new workloads (Option B) may help in the short term but does not align
C
-M
P




with the business need to continue adding workloads.
C
N




Deleting workloads (Option C) is not a viable option because the customer wants to
ix
an
ut




add more, not remove them.
N




Changing the target to 9 months (Option D) does not change the actual resource
constraints; it only
alters the target timeframe.
Reference: Nutanix Prism Central ? Capacity Planning and Runway Analysis Nutanix
Bible ? Cluster Resource Management and Scaling
Nutanix Support KB ? How to Extend Cluster Runway with Resource Scaling


2.An administrator is trying to configure Metro Availability between Nutanix ESXi-
based clusters.

, However, the Compatible Remote Sites screen does not list all required storage
containers.
Which two reasons could be a cause for this issue? (Choose two.)
A. Source and destination hardware are from different vendors.
B. The remote site storage container has compression enabled.
C. The destination storage container is not empty.
D. Both storage containers must have the same name.
Answer: C, D
Explanation:
For Metro Availability to work properly, the storage containers at both the primary and
secondary sites must meet certain requirements:
The storage containers must have the same name (Option D). This ensures that
replication and failover work seamlessly. If the names do not match, the storage




t
en
containers will not be listed as compatible.




m
ve
ie
The destination storage container must be empty (Option C). Metro Availability




ch
A
requires a clean storage container at the secondary site to receive data. If the




r
ou
Y
container already contains data, it cannot be used.




ce
an
Option A is incorrect: Different vendor hardware does not affect Metro Availability

nh
-E
compatibility. ns
Option B is incorrect: Compression does not affect Metro Availability compatibility.
io
st
ue




However, it is recommended to keep compression settings aligned between sites.
Q
m




Reference: Nutanix Documentation: Metro Availability Deployment Guide Nutanix
xa
lE




Best Practices for Metro Availability
ea
R




Nutanix KB 2093: Troubleshooting Metro Availability Storage Container Issues
h
it
w
2)
0
8.
(V




3.An administrator receives complaints about VM performance.
ps
um
D
10
6.
I-
C
-M
P
C
N
ix
an
ut
N
Free
Get access to the full document:
Download

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
greencheryl

Get to know the seller

Seller avatar
greencheryl Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
101
Member since
2 year
Number of followers
31
Documents
251
Last sold
6 hours ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions