Which of the following exceptions to the full funding policy
would allow the Government to budget for buying three
years' worth of engines under one contract in order to save
money? - Correct Answer ✔ ✔ Multiyear Procurement
If the Government has funded the entire development of an
item, the Government is entitled to _______ rights. - Correct
Answer ✔ ✔ Unlimited
Using the Capability Maturity Model Integration for
Development (CMMI-DEV), an organization whose process
improvement capabilities were well defined both in individual
process areas and across multiple process areas, would be
rated at least: - Correct Answer ✔ ✔ Level 3
,A program office for a command and control system needs to
prepare a Statement of Work (SOW) that lays out the
products to be delivered and the technical reviews to be held
by the contractor. Which tool would they most likely use? -
Correct Answer ✔ ✔ Work Breakdown Structure (WBS)
Which of the following supportability analysis tools identifies
steps, spares and materials, tools, support, equipment, and
personnel skills levels? - Correct Answer ✔ ✔
Maintenance Task Analysis (MTA)
The _______ includes details of processes, procedures, and
materials used in fabrication and is usually controlled by the
contractor. - Correct Answer ✔ ✔ Product Baseline
The approved detail design resulting from the __________
serves as a basis for making the decision to begin the
,fabrication of production representative prototype systems. -
Correct Answer ✔ ✔ Critical Design Review
What is the purpose of fielding/deployment planning? -
Correct Answer ✔ ✔ To provide for a smooth
introduction of the system to the user.
When Congress does not appropriate sufficient funds to cover
the cost of work to be performed under a contract, the
Government may: - Correct Answer ✔ ✔ Terminate the
contract for convenience
The two main principles of lean manufacturing are
___________? - Correct Answer ✔ ✔ Responsiveness to
change and minimization of waste
The _______________________________ guides activities in
the Engineering and Manufacturing Development (EMD)
, phase. - Correct Answer ✔ ✔ Capability Development
Document (CDD)
Which of the following technical reviews are you most likely
to find only in the Production and Deployment phase? -
Correct Answer ✔ ✔ Physical Configuration Audit (PCA)
What type of contract provides for payment to the contractor
of a negotiated fee that is fixed at the inception of the
contract? - Correct Answer ✔ ✔ Cost-Plus-Fixed-Fee
Contract (CPFF)
When should Affordability Goals be established? - Correct
Answer ✔ ✔ Milestone A
What technical process of Systems Engineering (SE) provides
the evidence that the system or system element performs its
intended functions and meets all performance requirements