100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

SOS NERC PREP - RELIABILITY EXAM LATEST 2024 ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS ALREADY GRADED A+

Rating
-
Sold
-
Pages
104
Grade
A+
Uploaded on
12-06-2025
Written in
2024/2025

SOS NERC PREP - RELIABILITY EXAM LATEST 2024 ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS (|ALREADY GRADED A+

Institution
SOS NERC
Course
SOS NERC











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
SOS NERC
Course
SOS NERC

Document information

Uploaded on
June 12, 2025
Number of pages
104
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ne
SOS NERC PREP - RELIABILITY EXAM LATEST 2024


sh
ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED




ne
ANSWERS (|ALREADY GRADED A+
la

tz




sh
Sp
A Balancing Authority has a 200 MW/0.1 Hz frequency bias with zero schedules.

ne
Frequency is 60.00 Hz and ACE is 0, what should the sum of all the Balancing




la
Authorities Interconnection ties equal?
sh




Sp

ne
A) Small MW amount out of the BA
la

tz
B) System Load




sh
Sp

ne
C) Zero




la
D) Total Generation - ANSWER-C) Zero
sh




Sp

ne
A simple power system is composed of three transmission lines that connect the
la

tz

generation area to the load area. The three lines are different lengths, but each




sh
Sp




line has the same impedance. Each line is initially loaded at 200 MW. The SOL of
ne



each line is 400 MW. If one of the three lines trips, what will be the loading on the



la
shortest remaining line and will the SOL of either remaining line be violated?
sh




Sp

ne
A) 400 MW/Yes
la

tz




B) 400 MW/No sh
Sp




C) 300 MW/Yes
ne




la
D) 300 MW/No - ANSWER-D) 300 MW/No
sh




Sp

ne
During a lightning storm, a fault on a transmission line results in the transmission
a




relay operating and locking-out. The transmission line cannot be returned to
tz
l




sh

service. After running a contingency analysis, the Transmission Operator realizes
Sp

ne




that if another transmission line relays, there could be cascading outages into a
la
sh




Sp
la
Sp

, ne
SOS NERC PREP - RELIABILITY EXAM LATEST 2024


sh
ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED




ne
ANSWERS (|ALREADY GRADED A+
la

tz




sh
Sp
neighboring system. Which of the following actions is appropriate for the
Transmission Operator?
ne




la
sh




Sp
A) Reduce transmission voltages by 5% to reduce customer demand.




ne
la

tz




sh
B) Notify others in the Interconnection of the situation via an Interconnection-
Sp

ne
wide telecommunications system.




la
sh




Sp
C) Continue operations without notifying anyone but try to reduce system




ne
loading.
la

tz




sh
Sp




D) Prepare a disturbance report and forward it to the Reliability Coordinator. -
ne



ANSWER-B) Notify others in the Interconnection of the situation via an



la
Interconnection-wide telecommunications system.
sh




Sp

ne
A Generator Operator has some vibration problems with a 500MW coal fired
la

tz




steam generator. As the result of the vibration problems the Generator Operator
sh
Sp




has to set the maximum reactive power production for that unit at 25 Megavar
ne




instead of the normal 200 Megavar. Who should the generator operator notify as
la
the result of this problem?
sh




Sp

ne
A) Transmission Operator
a
tz




B) System Coordinator
l




sh
Sp

ne




C) Department of Energy (DOE)
la


D) Regional Reliability Organization - ANSWER-A) Transmission Operator
sh




Sp
la
Sp

, ne
SOS NERC PREP - RELIABILITY EXAM LATEST 2024


sh
ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED




ne
ANSWERS (|ALREADY GRADED A+
la

tz




sh
Sp

ne
A high voltage transmission line was scheduled out for routine maintenance




la
several weeks in advance. On the scheduled outage date, field personnel call to
sh




Sp
inform the system operator that they will be taking the line out of service. Bad




ne
weather the previous day has forced other outages. What should the system
la

operator do?
tz




sh
Sp

ne

A) Wait until peak is over to make a decision




la
sh




Sp

ne
B) Run a power flow study to determine the effects of this line outage
la

tz




sh
Sp




C) Do not allow the outage
ne




la
D) Allow the outage because it was scheduled in advanced - ANSWER-B) Run a
sh




Sp
power flow study to determine the effects of this line outage




ne
la

tz




sh
Interconnection frequency is 60.20 Hz. Your ACE is a large positive value and your
Sp




AGC is pulsing your units down. What should you do?
ne




la
sh




A) Suspend AGC and investigate.
Sp

ne
B) Place AGC in flat tie line control.
a
tz




C) Leave AGC in operation as your units respond.
l




sh
Sp




D) Place AGC in constant frequency control. - ANSWER-C) Leave AGC in operation
ne




as your units respond.
la
sh




Sp
la
Sp

, ne
SOS NERC PREP - RELIABILITY EXAM LATEST 2024


sh
ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED




ne
ANSWERS (|ALREADY GRADED A+
la

tz




sh
Sp

ne
Which of the following is the most common effect of a Geomagnetic Disturbance




la
on the power system?
sh




Sp

ne
la

A) Increase static electricity
tz




sh
B) Transformer cores becoming saturated
Sp

ne

C) Generator output varies




la
D) Abnormal VAR direction - ANSWER-B) Transformer cores becoming saturated
sh




Sp

ne
la



In a power system, which type of power provides indication of voltage problems,
tz


is critical for support of heavily loaded transmission lines, and is necessary to have




sh
Sp




sufficient dynamic reserves in preparation for a contingency?
ne




la
sh




A) Solar Power
Sp

ne
B) Real Power
la

tz




C) Reactive Power sh
Sp




D) Apparent Power - ANSWER-C) Reactive Power
ne




la
sh




You are a transmission operator and you have several large generators operating
Sp

ne
at full load on the western portion of your transmission system with 34 kV and
230 kV transmission lines connecting the generators to the larger metropolitan
a
tz




and Industrial areas in the eastern portion of your transmission system. You
l




sh
Sp




realize by SCADA indications that there is a large power angle approaching 88
ne




degrees between some of the sending busses at the generation sites and the
la


receiving buses around the load areas. You realize that the slightest contingency
sh




Sp
la
Sp

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Splashnetz Chamberlain
View profile
Follow You need to be logged in order to follow users or courses
Sold
283
Member since
1 year
Number of followers
11
Documents
1041
Last sold
1 day ago
Spashnetz

I'm, a dedicated medical doctor (MD) with a passion for helping students excel in their exams. With my extensive experience in the medical field, I provide comprehensive support and effective study techniques to ensure academic success. My unique approach combines medical knowledge with practical strategies, making me an invaluable resource for students aiming for top performance. Discover my proven methods and start your journey to academic excellence with me on Stuvia today, Are you striving for academic excellence and top grades? Look no further! At A+ Achiever we provide premium study materials meticulously crafted to help you ace your exams and achieve your academic goals.

Read more Read less
4.7

273 reviews

5
238
4
7
3
10
2
4
1
14

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions