100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

ACI Certification – Concrete Field Testing Technician Grade 1 (CP-1) Exam 2025–2026 ASTM Standards & Field Procedures Verified Questions & Correct Answers

Rating
-
Sold
-
Pages
17
Grade
A+
Uploaded on
06-06-2025
Written in
2024/2025

This comprehensive exam guide provides fully verified questions and answers for the ACI Certification CP-1 Grade 1 Field Testing Technician Exam for the 2025–2026 cycle. The document includes more than 100 detailed items based on ASTM standards such as C31, C138, C143, C172, C231, C1064, and C173. Topics include slump test techniques, density/yield calculations, consolidation procedures, air content (pressure and volumetric), sampling, curing, and temperature measurement. Ideal for construction professionals preparing for hands-on certification or retesting.

Show more Read less
Institution
ACI Certification- Concrete Field Testing Technici
Course
ACI Certification- Concrete Field Testing Technici

Content preview

ACI Certification- Concrete Field Testing Technician Grade 1
CP-1 (12) Exam 2025–2026 Accurate Real Exam Questions
and Verified Correct Answers JUST RELEASED
After the final rodding, the sides of the slump mold should be tapped lightly with the
tamping rod. True or False? - answer>>>False


When raising the slump mold, it should not be rotated or twisted. True or False? -
answer>>>True


How much time is allowed for lifting the slump mold? - answer>>>5 ± 2 seconds


The measurement for slump is made from the top of the mold to what point of the
concrete specimen? - answer>>>The displaced original center of the top surface of the
specimen


The slump of the concrete is measured and reported to the nearest _____. - answer>>>¼
in. [5 mm]


How much time is allowed to conduct the slump test from beginning to completion? -
answer>>>2½ minutes


ASTM C138 - answer>>>Standard Test Method for Density (Unit Weight),
Yield, and Air Content (Gravimetric) of Concrete


The diameter of the tamping rod used in this test method is _____ . - answer>>>⅝ in. [16
mm]


What is the required shape of the tamping end of the rod? - answer>>>Rounded to a
hemispherical tip


What is the required minimum frequency of the vibrator used in this test method? -
answer>>>7000 vibrations per minute

,The outside diameter or side dimension of the vibrating element must be at least _____
but not greater than _____ . - answer>>>0.75 in. [19 mm], 1.50 in. [38 mm]


A plastic container can be used for the measure in this method. True or False? -
answer>>>False, measure must be steel or other suitable metal


What is the minimum thickness of a metal strike-off plate? - answer>>>¼ in. [6 mm]


What is the minimum thickness for a glass or acrylic strike-off plate? - answer>>>½ in. [12
mm]


What is the specified weight of the mallet used on measures that are 0.5 ft3 [14 L] or
smaller? - answer>>>1.25 ± 0.50 lb. [600 ± 200 g]


Measures other than air meter bowls used for this test must conform to ASTM _____. -
answer>>>C29


Air meter bowls used for this test must conform to ASTM _____ and be calibrated for
volume according
to ASTM _____. - answer>>>C231, C29


The concrete sample must be obtained in accordance with what ASTM method? -
answer>>>C172


What method of consolidation must be used when the slump is greater than 3 in. [75
mm]? - answer>>>Rodding


What method of consolidation must be used when the slump is less than 1 in. [25 mm]? -
answer>>>Vibration


If rodding is the method of consolidation being used, the measure must be filled in how
many layers? - answer>>>3

, For a measure of 0.5 ft3 [14 L], what is the required number of strokes of the tamping rod
for consolidation
of each layer? - answer>>>25


When rodding the middle and the top layers, the tamping rod should penetrate into the
layer below approximately _____. - answer>>>1 in. [25 mm]


If vibration is the method of consolidation, the measure must be filled in _____
approximately equal layers. - answer>>>2


If, after consolidation of the final layer, the concrete level is 1/2 in. (13 mm) above the top
of the measure, what should be done? - answer>>>Remove a representative portion of
the excess concrete with a trowel or scoop


After consolidation of the final layer, an excess of concrete _____ above the top of the
measure is considered optimum. - answer>>>⅛ in. [3 mm]


After completing the strike-off procedure, what must be done before weighing the
measure and sample? - answer>>>Clean off any excess concrete


Density (Unit Weight) Calculation
Known: Volume of measure = 0.504 ft3 [14.27 L or 0.01427 m3]
Mass of empty measure = 19.6 lb [8.89 kg]
The procedures of Method C138 are followed, and the mass of the measure plus the
concrete is found to be 92.1 lb [41.78 kg]. Calculate the density of the concrete in lb/ft3
[kg/m3]. - answer>>>143.9 lb/ft3 [2305 kg/m3]


Yield Calculations
For a design batch of 7.0 yd3 [5.4 m3], the total mass of all materials batched was 27,300
lb [12,383 kg]. Using the density of the concrete as determined in Question 21, calculate:
a) The yield per batch in ft3
b) The yield per batch in yd3
c) The yield in m3
d) The yield per cubic yard in ft3/yd3 - answer>>>a. Yield per batch = 189.7 ft3

Written for

Institution
ACI Certification- Concrete Field Testing Technici
Course
ACI Certification- Concrete Field Testing Technici

Document information

Uploaded on
June 6, 2025
Number of pages
17
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • concrete curing methods

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
dennohz2000 Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
219
Member since
2 year
Number of followers
47
Documents
5007
Last sold
10 hours ago

4.1

56 reviews

5
34
4
8
3
6
2
2
1
6

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions