100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

4th TSSA Part B - Unit 4 2025/2026 Exam Questions with Detailed Verified Answers (100% Correct Answers) | Already Graded A+

Rating
-
Sold
-
Pages
14
Grade
A+
Uploaded on
03-06-2025
Written in
2024/2025

4th TSSA Part B - Unit 4 2025/2026 Exam Questions with Detailed Verified Answers (100% Correct Answers) | Already Graded A+ Larger capacity, high pressure fuel trains are -

Institution
TSSA
Course
TSSA









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
TSSA
Course
TSSA

Document information

Uploaded on
June 3, 2025
Number of pages
14
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

4th TSSA Part B - Unit 4 2025/2026 Exam
Questions with Detailed Verified
Answers (100% Correct Answers) |
Already Graded A+



Larger capacity, high pressure fuel trains are - 🧠ANSWER ✔✔more

complex


The main burner test firing valve should be opened - 🧠ANSWER ✔✔before

starting the main burner

What is the recommended boiler water pH for wet layup? - 🧠ANSWER

✔✔10


R4B04-03-03-07 Failure to _____ the furnace thoroughly before light-up

can cause a furnace explosion. - 🧠ANSWER ✔✔purge


R4B04-05-02-01 When cooling down a steam boiler that has been taken

out of service, a vent valve on a steam drum should be opened to: -

🧠ANSWER ✔✔Prevent a vacuum from forming in the boiler



COPYRIGHT©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED
1

, How often should operator rounds be performed? - 🧠ANSWER ✔✔1 to 3

times per shift


What should Power Engineers carry at all times? - 🧠ANSWER ✔✔a

flashlight


When a power failure occurs, control valves - 🧠ANSWER ✔✔go to a fail-

safe position.

When a combustion air opening is equipped with dampers, the dampers

must be - 🧠ANSWER ✔✔interlocked with the burner, and fully open before

starting the boiler.

New boilers require a _____________ and a _____________ dry-out

before entering operation. - 🧠ANSWER ✔✔boil-out, refractory


R4B04-03-03-11 If a steam boiler is in service and no water level shows in

the gauge glass, the first action would be to: - 🧠ANSWER ✔✔determine

whether the gauge glass is completely full or completely empty.

Because natural gas is colourless and odourless, ___________ is added to

the gas so that it is easier to detect a leak. - 🧠ANSWER ✔✔mercaptan




COPYRIGHT©JOSHCLAY 2025/2026. YEAR PUBLISHED 2025. COMPANY REGISTRATION NUMBER: 619652435. TERMS OF USE. PRIVACY
STATEMENT. ALL RIGHTS RESERVED
2

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
JOSHCLAY West Governors University
View profile
Follow You need to be logged in order to follow users or courses
Sold
232
Member since
2 year
Number of followers
14
Documents
17440
Last sold
2 hours ago
JOSHCLAY

JOSHCLAY EXAM HUB, WELCOME ALL, HERE YOU WILL FIND ALL DOCUMENTS & PACKAGE DEAL YOU NEED FOR YOUR SCHOOL WORK OFFERED BY SELLER JOSHCLAY

3.6

48 reviews

5
20
4
7
3
10
2
5
1
6

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions